Mitigation Action TitleAction CategorySchedule PhaseFebruary 17, 1911PrioritySocialAdministrativePoliticalLegalEconomicEnvironmentTimelineWeb LinkNotes 
Progressive Urban Resource Exchange (PURE)Coastal/Natural ResourcesExistingJuly 14, 1910Cost estimate $20,000 -$180,000
Radio SOPEmergency ServicesExistingJuly 14, 1910
Pro-bono environmental servicesEducation and AwarenessExistingJuly 14, 1910N/A
NYC Voluntary Cleanup ProgramPrevention and PolicyExistingJuly 14, 1910N/A
NYC Brownfield Incentive Grant (BIG) programProperty ProtectionsExistingJuly 14, 1910N/A
Cleaning Up New York City community education video seriesEducation and AwarenessCompletedFebruary 3, 1900N/A
NYC Green Property CertificationEducation and AwarenessExistingFebruary 11, 1900N/A
Pathogen Plan developmentPrevention and PolicyCompletedFebruary 17, 1900N/A
Harlem River lift bridgeInfrastructure ProjectExistingJuly 14, 1910N/AHarlem River Lift Bridge - $10 million. This project continues a rehabilitation program initiated in the 2010-2014 Capital Program. The work includes repairs to cracked piers that support the critical moveable bridge which provides the only access into Manhattan for all Metro-North trains traveling to and from Grand Central Terminal.
Secure HAZMAT at DOT facilitiesProperty ProtectionsExistingJuly 14, 1910N/Aaint storage facility completed at Wythe Yard; trush wash stations and spill containment equipment; on-going HAZMAT compliance work across the agency.
Construction Code revisionProperty ProtectionCompletedJuly 14, 1910High
NYCHA fresh water supplyPrevention and PolicyPotentialJuly 14, 1910High1111100
Brownfield cleanup in the 100-year floodplainCoastal/Natural ResourcesExistingJuly 14, 1910High
Environmental research- SPEED 2.0Prevention and PolicyExistingApril 3, 1900High
BrownfieldWORKS!Education and AwarenessExistingJuly 14, 1910Medium
Environmental Project Information Center (EPIC)Education and AwarenessCompletedApril 14, 1900High
Marsh Migration ModelingEducation and AwarenessCompletedJuly 14, 1910http://warrenpinnacle.com/prof/SLAMM/NYSERDA/

http://slammview.org/

http://warrenpinnacle.com/prof/SLAMM/NYSERDA2015/index.html
Beach restorationCoastal/Natural ResourcesCompletedJuly 14, 1910
Protection of Rikers shorelinesCoastal/Natural ResourcesExistingApril 28, 1900N/A
Rikers Island north shore administrative modular unitsProperty ProtectionsExistingMay 3, 1900N/A
Renourishment of Orchard Beach, BronxCoastal/Natural ResourcesCompletedJuly 14, 1910Mediumhttp://www.nan.usace.army.mil/Media/Fact-Sheets/Fact-Sheet-Article-View/Article/487413/fact-sheet-orchard-beach/
Nourishment cycle dependent on project surveys and available funding
Retrofit Pump Stations for ResiliencyInfrastructure ProjectPotentialJuly 14, 1910High1111000
Retrofit Wastewater Treatment Plants for ResiliencyInfrastructure ProjectPotentialJuly 14, 1910Medium1111-100
Build It Back - home elevationsProperty ProtectionsExistingJuly 29, 1900
Land AquisitionsPrevention and PolicyExistingAugust 28, 1908
Safe Community Room Spaces for Sheltering in PlaceEmergency ServicesPotentialSeptember 6, 1908High111111-1
Training Program for ADA Coordinators in the Shelter Command CenterEmergency ServicesExistingJuly 14, 1910
Open-Source Tropical Cyclone Risk Modeling for NYSEducation and AwarenessExistingMarch 3, 1901
Nassau County Back Bays, NYInfrastructure ProjectExistingJune 22, 1901http://www.nan.usace.army.mil/Media/Fact-Sheets/Fact-Sheet-Article-View/Article/1098572/nassau-county-back-bay-csrm-study-ny/
Project is located in Queens, Nassau County, Suffok County
Flood Protection - 60th PctProperty ProtectionsPotentialJuly 14, 1910High1111100
Dock Repair and hardening of Harbor CharlieProperty ProtectionsCompletedSeptember 8, 1909
Dock repair and hardening - Harbor GeorgeProperty ProtectionsCompletedMay 25, 1900
Dock repair and hardening - Launch Repair ShopProperty ProtectionsCompletedSeptember 8, 1909
East Harlem Resiliency StudyPrevention and PolicyExistingNovember 10, 1909https://www.nycgovparks.org/planning-and-building/planning/neighborhood-development/east-harlem-resiliency
Cloudburst Resiliency Planning StudyPrevention and PolicyExistingJuly 14, 1910http://www.nyc.gov/html/dep/pdf/climate/nyc-cloudburst-study.pdf
Build It Back - Storm Repair and RehabilitationProperty ProtectionsExistingJune 15, 1906
Alternative Mitigation Measures for HomeownersProperty ProtectionsPotentialJuly 14, 1910High1111111
NFIP Enrollment CampaignEducation and AwarenessPotentialJuly 14, 1910High1111010
Mitigation and Elevation ProgramProperty ProtectionsPotentialJuly 14, 1910High1111010
Property Purchase ProgramPrevention and PolicyPotentialJuly 14, 1910Medium1100010
Homeowner Technical Assistance ProgramPrevention and PolicyPotentialJuly 14, 1910High1111010
Flood Hazard MapperEducation and AwarenessExistingJuly 14, 1910http://dcp.maps.arcgis.com/apps/webappviewer/index.html?id=1c37d271fba14163bbb520517153d6d5
Flood Hazard MapperEducation and AwarenessExistingJuly 14, 1910http://dcp.maps.arcgis.com/apps/webappviewer/index.html?id=1c37d271fba14163bbb520517153d6d5
Resilient Retail Study and Resilient Art SpacesPrevention and PolicyCompletedApril 4, 1904https://www1.nyc.gov/site/planning/plans/resilient-retail/resilient-retail.page
https://www1.nyc.gov/assets/planning/download/pdf/plans-studies/resilient-neighborhoods/west-chelsea/gallery-guide-102015.pdf
First Floor Elevation AnalysisPrevention and PolicyExistingJuly 14, 1910
WRP Policy 6.2 MaterialsPrevention and PolicyCompletedNovember 4, 1902http://www1.nyc.gov/site/planning/applicants/wrp/wrp.page
Flood Resilience PosterEducation and AwarenessCompletedFebruary 28, 1903https://www1.nyc.gov/assets/planning/download/pdf/plans-studies/flood-resiliency-update/poster.pdf
Resiliency VideoEducation and AwarenessCompletedAugust 14, 1908https://www1.nyc.gov/site/planning/plans/climate-resiliency/climate-resiliency.page
Resiliency NewslettersEducation and AwarenessExistingJuly 14, 1910http://www1.nyc.gov/site/planning/plans/climate-resiliency/climate-resiliency.page?tab=2
East Side Coastal ResiliencyInfrastructure ProjectExistingNovember 14, 1908
Project Open HousePrevention and PolicyExistingJuly 14, 1910https://www1.nyc.gov/site/mopd/initiatives/project-open-house.page
Marine Company 1 Wave ScreensProperty ProtectionsExistingJuly 14, 1902
Marine Company 6 - Facility and Fire BoatProperty ProtectionsExistingJuly 14, 1902
Marine 9 - Wave AttenuatorProperty ProtectionsCompletedJuly 6, 1903
EMS 4 Flood ProtectionProperty ProtectionsExistingJuly 14, 1902
Engine 202 Flood ProtectionProperty ProtectionsPotentialJuly 14, 1910Medium1111000
Marine 1 - Pier 53 Flood ProtectionProperty ProtectionsPotentialJuly 14, 1910Medium1111000
Borden Avenue Veterans' Residence Flood MitigationProperty ProtectionsExistingJuly 14, 1910
Building Electrical Protections 100 PctProperty ProtectionsExistingJuly 14, 1910
DOC Shooting RangeProperty ProtectionsExistingAugust 5, 1909
VCBC Power Distribution CenterProperty ProtectionsExistingAugust 10, 1909
Electrical upgrades for Police Museum Property ProtectionsExistingJuly 14, 1910
Electrical Conduit Replaced and Upgraded - 60th PctProperty ProtectionsExistingJuly 14, 191090% FEMA funded
Interim Flood Protection MeasuresEmergency ServicesExistingSeptember 29, 1908
3-D Mapping Underground ProjectPrevention and PolicyPotentialJuly 14, 1910High1111110
Tide Gauge WestchesterEmergency ServicesPotentialJuly 14, 1910High1011110
Resiliency Innovations for a Stronger Economy (RISE) NYCProperty ProtectionsExistingOctober 30, 1909https://www.nycedc.com/program/rise-nyc
Lower Manhattan Coastal Resiliency - BatteryCoastal/Natural ResourcesExistingJuly 14, 1910
New Brighton Comfort Station ReconstructionInfrastructure ProjectCompletedMarch 20, 1902
North 5th Street Bulkhead Reconstruction (Hurricane Sandy)Infrastructure ProjectCompletedAugust 14, 1908https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6156
Tiffany Street Pier Reconstruction (Hurricane Sandy)Infrastructure ProjectCompletedAugust 10, 1908https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6119
Joe Michael's Mile Reconstruction (Hurricane Sandy)Infrastructure ProjectCompletedFebruary 28, 1903https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6257
Sandpiper Playground ReconstructionInfrastructure ProjectExistingMarch 5, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6478
Mannahatta Fountain ReconstructionInfrastructure ProjectExistingFebruary 13, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6275
New Dorp Center Interior Reconstruction (Hurricane Sandy)Infrastructure ProjectExistingOctober 6, 1905https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6318
World's Fair Marina ReconstructionInfrastructure ProjectExistingApril 25, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8551
Bayside Marina ReconstructionInfrastructure ProjectExistingMay 15, 1902https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6652
Beach 24th/25th RampsInfrastructure ProjectExistingJune 28, 1906https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8972
Beach 88th Street Park Construction (Baybreeze Park)Infrastructure ProjectExistingJune 28, 1906https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8970
Urban Waterfront Adaptive Strategies reportEducation and AwarenessCompletedMay 25, 1900N/AProject was completed in 2013.
FDNY emergency servicesEmergency ServicesCompletedJune 5, 1900MediumThe FDNY used DHS funds to purchase high-volume pumping systems, dewatering equipment,  high-pumping fireboats, small rapid response craft,  swift water rescue boats, zodiac rescue boats, swift water rescue suits and PPE, personal flotation devices, and high-axle vehicles.  Up to 10 swift water teams can be staffed and outfitted.
Resilient flood protection at senior centersProperty ProtectionsCompletedJune 13, 1900
Flood protection measures at Brooklyn JASAProperty ProtectionsCompletedJune 13, 1900
Flood barriers, sump pumps Queens JASAProperty ProtectionsCompletedJune 13, 1900
Emergency generator at Manhattan senior centerProperty ProtectionsCompletedJune 13, 1900
Far Rockaway multi-family design competitionProperty ProtectionsCompletedJuly 1, 1900N/A
Assistance for Damaged Properties (Build it Back Program)Property ProtectionsExistingJuly 8, 1900N/A
Backup generator at Governors IslandEmergency ServicesCompletedJuly 17, 1900N/A
Mitigation of Hugh L. Carey and Queens Midtown TunnelsInfrastructure ProjectExistingJuly 8, 1900N/A
Harlem River lift bridgeProperty ProtectionsExistingJuly 29, 1900N/AHarlem River Lift Bridge - $10 million. This project continues a rehabilitation program initiated in the 2010-2014 Capital Program. The work includes repairs to cracked piers that support the critical moveable bridge which provides the only access into Manhattan for all Metro-North trains traveling to and from Grand Central Terminal.
Hudson Line substations (including Riverdale location)Property ProtectionsExistingAugust 6, 1900N/AUpper Hudson and Harlem Line Stations Priority Repairs - $40 million. Priority component repairs at stations along the Upper Hudson and Upper Harlem Line will improve the condition of the stations and provide an enhanced customer experience. In addition, potential intermodal improvements at White Plains based on an upcoming City of White Plains led study to be undertaken in conjunction with the MTA and other stakeholders.
Power and C&S infrastructure improvementsProperty ProtectionsExistingAugust 14, 1900N/AProposed 2015-2019 Capital Program - $101 million. The proposed 2015-2019 Capital Program allocates $101 million, or approximately 4 percent of the total capital program budget, to power projects.
Flood mitigation at MJ Quill, Castleton, Yukon, Casey Stengel, Ulmer Park depotsProperty ProtectionExistingJuly 14, 1910N/AMultiple contracts to address needs. This project will provide flood mitigation measures to protect the Casey Stengel, Castleton, Michael J. Quill, and Yukon Depots.
Flood mitigation at Far Rockaway depotProperty ProtectionsExistingAugust 28, 1900N/A
NYC Clean Soil BankInfrastructure ProjectExistingJuly 14, 1910N/A
Overhead utility linesPrevention and PolicyExistingJuly 14, 1910N/AOneNYC 2017 PR: Develop a plan to address any remaining sites that require hardening
Annual Hurricane Tabletop ExerciseEducation and AwarenessExistingJuly 14, 1910N/A
Oakwood Beach (SI) levee and tidegateInfrastructure ProjectCompletedSeptember 21, 1900N/A
Plumb Beach groins and breakwaterInfrastructure ProjectCompletedApril 27, 1900N/Ahttp://www.nan.usace.army.mil/Media/Fact-Sheets/Fact-Sheet-Article-View/Article/487400/fact-sheet-plumb-beach/
Coastal Storm Risk Management Study and Pre-engineered Design for South Shore of Staten IslandInfrastructure ProjectExistingOctober 7, 1900N/Ahttp://www.nan.usace.army.mil/Missions/Civil-Works/Projects-in-New-York/South-Shore-of-Staten-Island/
Design underway; construction estimated start date is 2019, upon execution of construction agreement.
Resilient neighborhoods planning studiesPrevention and PolicyCompletedOctober 16, 1900N/Ahttps://www1.nyc.gov/site/planning/plans/resilient-neighborhoods.page
DCP planning support and technical assistance for Sandy disaster recoveryPrevention and PolicyExistingOctober 24, 1900N/Ahttp://www1.nyc.gov/site/planning/plans/flood-resilience-zoning-text-update/flood-resilience-zoning-text-update.page
Hardening pumping stationsInfrastructure ProjectExistingNovember 1, 1900N/A
Hardening wastewater treatment plantsInfrastructure ProjectExistingNovember 1, 1900N/A
Alternatives for Rockaway Wastewater Treatment PlantInfrastructure ProjectPotentialJuly 14, 1910Medium1011001
Sunset Cove Parks sustainable shoreline at Broad Channel, Jamaica BayCoastal/Natural ResourcesExistingNovember 19, 1900N/Ahttps://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/7132
FDNY storehouse improvementProperty ProtectionsCompletedJune 5, 1900N/AStorehouse built in the Navy Yard and Foster Avenue.
EMS Station 43 / Coney Island ShopsEmergency ServicesCompletedDecember 1, 1900N/A
Power and communications/signal infrastructure mitigationProperty ProtectionsExistingJuly 14, 1910N/AMultiple communication and signal infrastructure projects continue.
Flood-hardening of vital communications, substations, transformers, mechanical equipment, revenue equipment, and other electronic systems at all MTA Bridges and Tunnels facilitiesProperty ProtectionExistingJuly 14, 1910N/AMultiple flood hardening projects are outlined in the 2015-19 Capital Plan
Raising Governors Island seawall for Hugh L. Carey TunnelInfrastructure ProjectExistingJuly 8, 1900N/AScoping Study kicked off December 2014. Initial report submitted March, 2015. Scoping study to be completed December, 2015. Next Steps: complete scoping study (end of 2015); Perform inspection of existing timber piles; planned project execution via Design-build contract; Construction planned to start in 2017.
Accessible Hurricane Evacuation CentersProperty ProtectionsExistingDecember 25, 1900N/A
NY & NJ Habor and Tributaries Coastal Storm Risk Management Feasibility StudyCoastal/Natural ResourcesExistingJanuary 2, 1901http://www.nan.usace.army.mil/Media/Fact-Sheets/Fact-Sheet-Article-View/Article/644997/fact-sheet-new-yorknew-jersey-harbor-tributaries-focus-area-feasibility-study/
Flooding preventionPrevention and PolicyCompletedOctober 6, 1900Medium
Emergency contractsEmergency ServicesExistingJuly 14, 1910Medium
Vernon C. Bain Center (VCBC) mooring system and site access improvementProperty ProtectionsPotentialJuly 14, 1910Medium1111-100Project not funded
EMS fallback sitesEmergency ServicesPotentialJuly 14, 1910High1111100
Outreach to residential building ownersEducation and AwarenessCompletedJuly 14, 1910High
HPD Design Guidelines for Multifamily New Construction & Senior HousingProperty ProtectionCompletedJuly 14, 1910Medium
Water-level monitoring/alarm systemsEmergency ServicesExistingJuly 14, 1910High
Window Protection at Emergency Operations Center (EOC)Emergency ServicesPotentialJuly 14, 1910Medium1011011
Storm surge/tidal gauge real-time monitoring systemEmergency ServicesExistingJuly 14, 1910Medium
Cleanup standards for waterfront brownfieldsPrevention and PolicyCompletedFebruary 26, 1901High
Building Code update for wind resiliency in new buildingsPrevention and PolicyExistingMarch 3, 1901HighThe building code was amended in 2014 in response to Sandy augmenting a number of provisions related to building design requirements to resist wind forces. The latest engineering and scientific data and experience are factored into our subsequent code updates which happen on a 3 year cycle. The current update process is expected to be completed by the end of 2018 and the updated code implemented in 2019.
Building Code update for wind resiliency in existing buildingsPrevention and PolicyExistingMarch 3, 1901HighLocal Law 31 of 2013 requires the procurement of a study of the effects of wind on the city’s existing built environment and a review of the current science on the frequency and severity of potential future wind events. This study will be completed in November 2018 and the findings will be taken into account in the next code update cycle in the next 3 years.
Power exercisesEmergency ServicesPotentialJuly 14, 1910High1111100
Arverne East Open Space Coastal ProtectionProperty ProtectionsExistingMarch 21, 1901
Palo Alto FirewallPrevention and PolicyPotentialJuly 29, 1900High1111101
Cisco ISEPrevention and PolicyPotentialJuly 29, 1900High1111101
Vmware NSX and VDIPrevention and PolicyPotentialJuly 29, 1900High1111101
Citywide Mobile Threat ProtectionEducation and AwarenessExistingJuly 14, 1910
Sustainment of the Advanced Persistent Threat SolutionProperty ProtectionsPotentialJuly 14, 1910Medium0111000
Controls to Privileged Users Access to Critical City NetworksProperty ProtectionsExistingJuly 14, 1910
Internet of Things (IoT)Property ProtectionsPotentialJuly 14, 1910Medium0111000
Operational Technology Security PlatformProperty ProtectionsPotentialJuly 14, 1910High1111110
Network Visibility PlatformProperty ProtectionsPotentialJuly 14, 1910High1111000
Replace Vulnerability Management SystemProperty ProtectionsPotentialJuly 14, 1910High1111000
Enterprise Endpoint Management SolutionProperty ProtectionsPotentialJuly 14, 1910Medium1111000
Control Privileged Users Access (Phase 1)Property ProtectionsExistingJuly 20, 1908
Control Privileged Users Access (Phase 2)Property ProtectionsPotentialJuly 14, 1910Medium0111000
Protection of City's data, systems and services from cyber attackProperty ProtectionCompletedMarch 29, 1901N/AProposing to sustain the investment with FFY18 UASI funding through August 2021 (see NEW tab).
Protection of City's data, systems and services from cyber attackProperty ProtectionExistingAugust 28, 1900
Citywide Cybersecurity Awareness ProgramEducation and AwarenessExistingJuly 14, 1910
Supplementation of IT securityPrevention and PolicyExistingJuly 14, 1910Medium
Cyber-security strategyPrevention and PolicyPotentialJuly 14, 1910High1111110
Protection of City's data, systems and services from cyber attackProperty ProtectionExistingApril 22, 1901Proposing to sustain the investment with FFY18 UASI funding (see NEW tab).
Data Discovery and Data Loss Prevention (DLP)Property ProtectionPotentialJuly 14, 1910High1111000Cost estimate includes software (700k citywide endpoints) plus inventory solution implementation.
Sustain Data Discovery and DLP: data classificationProperty ProtectionsPotentialJuly 14, 1910Medium1011000Cost estimate includes software renewal (700k citywide endpoints) plus data classification solution deployment.
Gouverneur Healthcare Services facility water conservationPrevention and PolicyCompletedJuly 14, 1910N/A
Croton filtration facilityInfrastructure ProjectCompletedDecember 24, 1900N/Ahttp://www.nyc.gov/html/dep/html/news/croton.shtml
Construction Code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
Hands-free sensors in restroom sinksPrevention and PolicyExistingJuly 14, 1910N/A
Low water-use toilets and flush sensorsPrevention and PolicyExistingJuly 14, 1910N/A
Water Demand Management Plan and water shortage rulesPrevention and PolicyExistingJune 5, 1901N/Anyc.gov/dep/conservation
Hydrant locking programPrevention and PolicyExistingJuly 14, 1910N/A
Maximizing reliability for water delivery from the Catskill/Delaware systemInfrastructure ProjectExistingJune 16, 1901N/A
Catskill Aqueduct capacityInfrastructure ProjectExistingJune 22, 1901N/A
Construction Code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
CUNY stakeholder outreachEducation and AwarenessExistingJuly 14, 1910N/A
Maven Electronic Disease Surveillance and Outbreak ManagementPrevention and PolicyExistingJuly 14, 1910N/A
StarLIMSPrevention and PolicyExistingJuly 14, 1910N/Ahttp://otda.ny.gov/policy/directives/2017/LCM/17-LCM-14-Attachment-4.pdf
http://www1.nyc.gov/assets/orr/pdf/Cool_Neighborhoods_NYC_Report_FINAL.pdf
Pandemic planEmergency ServicesExistingJuly 14, 1910N/A
Pandemic planningPrevention and PolicyPotentialJuly 14, 1910High1111000
Secure All FurnitureProperty ProtectionsPotentialSeptember 6, 1908Medium101111-1
Conduct Emergency DrillsEducation and AwarenessPotentialSeptember 29, 1908High1111011
Gouverneur Healthcare Services upgradePrevention and PolicyCompletedJuly 14, 1910N/A
Ground stabilizationPrevention and PolicyCompletedJuly 14, 1910N/A
Building upgrades to seismic codesPrevention and PolicyCompletedJuly 14, 1910Medium
Construction Code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
Construction Code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
Wastewater treatment plant facility seismic retrofitProperty ProtectionExistingJuly 14, 1910N/A
City Tunnel 3Infrastructure ProjectExistingAugust 16, 1901N/A
Seismic studies and retrofitProperty ProtectionExistingJuly 14, 1910N/A
Building code updatePrevention and PolicyCompletedAugust 26, 1901N/ACurrent code revision cycle will review ASCE 7-10 and -16 versions
Mechanical equipment seismic upgradeProperty ProtectionsExistingJuly 14, 1910High
Seismic protection for sewersProperty ProtectionsPotentialJuly 14, 1910Medium1011001
Seismic inspection and retrofit for drinking water distribution systemProperty ProtectionPotentialJuly 14, 1910Medium1-111011
HPD facility improvementProperty ProtectionsPotentialJuly 14, 1910High1111010
UPACA (Site 6)Property ProtectionsPotentialJuly 14, 1910High1111100
Install Ceiling Fans for HPD Buildings without Air ConditioningPrevention and PolicyPotentialSeptember 6, 1908Medium111100-1
Cool Neighborhoods StudyPrevention and PolicyExistingJuly 14, 1910https://www1.nyc.gov/assets/orr/pdf/Cool_Neighborhoods_NYC_Report_FINAL.pdf
Parkside NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingJune 9, 1909Cost estimate $20,000 -$180,000
Vandalia NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901Cost estimate $20,000 -$180,000
New Lane NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901Cost estimate $20,000 -$180,000
Borinquen Plaza NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901Cost estimate $20,000 -$180,000
Hope Gardens NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901Cost estimate $20,000 -$180,000
Rosetta Gaston NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901Cost estimate $20,000 -$180,000
Jackie Robinson NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901Cost estimate $20,000 -$180,000
Hope Gardens Multi Service NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901Cost estimate $20,000 -$180,000
Independence Tower NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901
Mt. Carmel Center NSC Cooling Center HVAC ReplacementPrevention and PolicyExistingMarch 3, 1901Cost estimate $20,000 -$180,000
AC upgrade for senior centersEmergency ServicesCompletedJuly 7, 1909
Construction Code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
Power conservationPrevention and PolicyCompletedJuly 14, 1910N/APlan is to double this in the next five years
Peak load management programPrevention and PolicyCompletedOctober 4, 1901N/A
Wastewater treatment aeration tanksCoastal/Natural ResourcesExistingJuly 14, 1910N/A
Construction Code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
Protection of engines from heat-related damageProperty ProtectionExistingJuly 14, 1910N/A
Protection of system from heat-related damageProperty ProtectionCompletedJuly 14, 1910N/A
Summer operations manualPrevention and PolicyExistingJuly 14, 1910N/A
Communications Redundant SystemEmergency ServicesCompletedJuly 14, 1910N/A
Power redundancy in City buildingsEmergency ServicesExistingJuly 14, 1910Medium
AC upgrade for senior centersEmergency ServicesExistingJuly 14, 1910Medium
AC availability and affordabilityPrevention and PolicyPotentialJuly 14, 1910Medium1101000DOHMH/HRA submitted joint letter requestion expansion of HEAP (budget and to include utility assitance) during HEAP public comment period
Urban heat island effect mitigationPrevention and PolicyExistingJuly 14, 1910Identifying funding sources
Cooling centersPrevention and PolicyPotentialJuly 14, 1910Medium1011100
Design and Construction Excellence 2.0 -- Guiding Principles
Prevention and PolicyCompletedApril 26, 1908https://www1.nyc.gov/site/ddc/about/guiding-principles.page
Affordable Multifamily Buildings Flood Insurance Financial AssistanceProperty ProtectionsPotentialSeptember 6, 1908Medium101111-1
Secured Location for HPD DocumentationProperty ProtectionsPotentialSeptember 29, 1908High1111101
Carver Houses Flooding Risk Reduction ProjectPrevention and PolicyPotentialJuly 14, 1910High1111111
Silver Jackets ProgramEducation and AwarenessExistingJuly 14, 1910http://silverjackets.nfrmp.us/State-Teams/New-York
Silver Jackets Program is a program that receives continuous funding and operates year round
Leonord Covello Cooling Center HVAC Replacement
Property ProtectionsExistingJune 5, 1909Cost Estimate $20,000 -$180,000
Flood Mitigation for HRA VehiclesProperty ProtectionsExistingJuly 14, 1910
Building Electrical Equipment - Eerie BasinProperty ProtectionsExistingJuly 14, 1910
Building Electrical Equipment - Floyd BennettProperty ProtectionsExistingJuly 14, 1910
Building Electrical Equipment - PSA 1Property ProtectionsExistingJuly 14, 1910
Boiler Protection - Floyd Bennet Property ProtectionsExistingJuly 14, 1910
Boiler Protection - 100 PctProperty ProtectionsExistingJuly 14, 1910
Boiler Protection - 60th PctProperty ProtectionsPotentialJuly 14, 1910High1111110
Elevated Equipment Storage - Bomb SquadProperty ProtectionsExistingJuly 14, 1910Included in the design of Rodman's Neck Rebuild
Pier 76 - Elevated Platform MitigationProperty ProtectionsCompletedAugust 25, 1909
Electrical Upgrade for QMS 23fd St WarehouseProperty ProtectionsExistingJuly 14, 1910
Electrical Conduit Replaced and Upgraded - PSA 1Property ProtectionsExistingJuly 14, 191090% FEMA Funded
Electrical Conduit Replaced and Upgraded for Floyd Bennett
Property ProtectionsExistingJuly 14, 191090% FEMA funded
Electrical Conduit Replaced and Upgraded for Harbor Charlie
Property ProtectionsExistingJuly 14, 191090% FEMA funded
Electrical Conduit Replaced and Upgraded for QMS WarehouseProperty ProtectionsExistingJuly 14, 191090% FEMA Funded
Electrical Conduit Replaced and Upgraded for Transit D 34Property ProtectionsExistingJuly 14, 191090% FEMA Funded
Electrical Conduit Replaced and Upgraded for Rodman's Neck Property ProtectionsExistingJuly 14, 1910
Electrical Conduit Replaced and Upgraded for Pier 76
Property ProtectionsExistingJuly 14, 1910
Electrical Conduit Replaced and Upgraded for Pier 36Property ProtectionsExistingJuly 14, 1910
Electrical Conduit Replaced and Upgraded for PSA 4Property ProtectionsExistingJuly 14, 191090% FEMA Funded
Electrical Conduit Replaced and Upgraded for Harbor GeorgeProperty ProtectionsExistingJuly 14, 191090% FEMA Funded
Electrical Conduit Replaced and Upgraded for Transit District 23Property ProtectionsExistingJuly 14, 191090% FEMA Funded
Electrical Conduit Replaced and Upgraded for 100 Pct
Property ProtectionsExistingJuly 14, 191090% FEMA Funded
Electrical Conduit Replaced and Upgraded for Erie Basin
Property ProtectionsExistingJuly 14, 191090% FEMA Funded
Asser Levy Boiler and Pool Dehumidifier RepairInfrastructure ProjectCompletedOctober 16, 1900https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6134
Rockaway Beach Shorefront Parkway Handball Court ReconstructionInfrastructure ProjectExistingDecember 28, 1909https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6852
Rockaway Beach Skate Park ReconstructionInfrastructure ProjectExistingJuly 14, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/3358
Vietnam Veterans Plaza Reconstruction (Hurricane Sandy) (M046-114M)Infrastructure ProjectExistingJuly 14, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6176
Glick Park Electrical Repairs (Hurricane Sandy)Infrastructure ProjectExistingJuly 14, 1910
Inwood Hill Nature Center Post-Sandy Reconstruction Infrastructure ProjectExistingJuly 14, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/7365
Tappen and South Beach Infrastructure ProjectExistingJune 5, 1904https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6171
Buono Beach Fountain RepairInfrastructure ProjectExistingJune 5, 1904https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/7154
Tribute Park Reconstruction (Hurricane Sandy)Infrastructure ProjectExistingJuly 12, 1903https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6618
Fairview Park Multi-Purpose Field and Landscape ConstructionInfrastructure ProjectExistingFebruary 13, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8779
Wolfe's Pond Park Playground Reconstruction (Hurricane Sandy)Infrastructure ProjectExistingMay 10, 1907https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8884
Midland Beach Landscape and Drainage ReconstructionInfrastructure ProjectExistingMarch 5, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8682
Buono Beach and Alice Austen Reconstruction due to Hurricane SandyInfrastructure ProjectExistingOctober 24, 1900https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6625
Hardening of EDC Emergency Operations CenterProperty ProtectionsCompletedJuly 14, 1910High
Facility protectionProperty ProtectionsCompletedJuly 14, 1910N/A
Effluent Pump StationsInfrastructure ProjectExistingJuly 14, 1910N/A
Mapping of flooding vulnerability dataPrevention and PolicyExistingJuly 14, 1910N/A
Designing for Flood Risk reportEducation and AwarenessCompletedMay 25, 1900N/AProject was completed in 2013.
Flood Resilient Building Design ManualEducation and AwarenessCompletedDecember 25, 1901HighReport was released in Oct. 2014, Available here: http://www.nyc.gov/html/dcp/html/retrofitting/index.shtml
Construction Code RevisionPrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Construction code updatePrevention and PolicyCompletedJuly 14, 1910N/A
Sandbagging of all fuel fill ports and man-waysEmergency ServicesCompletedJuly 14, 1910N/APreliminary standard operating procedures for any forecasted event that threatens facilities
Roof drains and guttersEmergency ServicesCompletedJuly 14, 1910N/APreliminary standard operating procedures for any forecasted event that threatens facilities.
Secondary feeders and wiring to BK1 and BK4Property ProtectionsCompletedFebruary 7, 1902N/AAll wiring and secondary feeders were replaced with marine grade to prevent destruction in the event this happens again. Facilites ran on limited power by generator until rectified.
Dewatering pumps at FDNY facilitiesEmergency ServicesCompletedJune 5, 1900MediumPortable dewatering pumps have been purchased with DHS funds. Auxiliary pumping unit can pump an estimated 3,000 gallons of water per minute.
Stormwater drainage improvementProperty ProtectionsCompletedJuly 14, 1910N/ACompleted
Stormwater drainage improvementProperty ProtectionCompletedJuly 14, 1910N/A
Critical facility relocationProperty ProtectionCompletedJuly 14, 1910N/A
High-level storm sewersInfrastructure ProjectExistingJuly 14, 1910N/A
Stormwater sewers in areas of Queens with limited drainage systemsInfrastructure ProjectExistingJuly 14, 1910N/A
Watershed Protection ProgramCoastal/Natural Resource ProtectionExistingMarch 10, 1902N/A
Valve installation/plumbing improvements through enhanced outreach and educationProperty ProtectionsCompletedJuly 14, 1910N/ADEP issued a Homeowner's Guide to Flood Preparedness in 2014 and a new version is in development for 2016. The Department uses this as a tool to help homeowners identify where their properties could be vulnerable. As part of the South East Queens program and inland flooding conversations with communities and elected officials, the guide is presented to homeowners who are experiencing flooding due to heavy rains. DEP BWSO funded the development and printing of the homeowner's guide.
Citywide Stormwater Resiliency StudyInfrastructure ProjectExistingJuly 29, 1900N/A
Sewer infrastructure upgradeInfrastructure ProjectExistingJuly 14, 1910N/A
Drainage system maintenance and pre-storm inspectionsEmergency ServicesExistingJuly 14, 1910N/A
Dam inspection programPrevention and PolicyExistingJuly 14, 1910N/A
Property and infrastructure protectionPrevention and PolicyExistingJuly 14, 1910N/A
Stormwater/flooding public outreach and educationEducation and AwarenessExistingJuly 14, 1910N/A
Construction code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
Facility protectionProperty ProtectionsExistingJuly 14, 1910N/A
Protection of NYCDOT facilities from flood impactsProperty ProtectionsExistingJuly 14, 1910N/AHarper Street bulkhead reconstruction achieved substantial completion in 2016. NYCDOT is working with NYCEM and the Interim Flood Protection Measures Program are implementing temporary flood protection measures at several DOT owned facilities. DOT is engaged in planning activities for the Harper Street fleet facility that will includie identifying long term resiliency options.

Cost estimate examples include:
• $24,000,000 (Harper Street bulkhead reconstruction)
• $13,500,000 (PW# 3602)
• $14,555,000 (PW# 4397)
Protection of NYCDOT tunnels in Lower Manhattan (Battery Park Underpass + West Side Underpass) from floodingProperty ProtectionsExistingJuly 14, 1910N/ANYCDOT has purchased and tested inflatable water dams to protect the Battery and Lower Manhattan underpass in case of flood risk. The agency is also in the process of contracting for upgrades to electric, mechanical, and fire suppression. system. Planning is also underway to procure design services for permanent betterments.
Wetlands protectionPrevention and PolicyExistingJuly 14, 1910N/A
Wetlands restorationCoastal/Natural Resource ProtectionExistingJuly 14, 1910N/A
Flushing Airport wetlands restorationCoastal/Natural ResourcesExistingMay 16, 1902N/A
Flood-resistant construction and materials for HPD-assisted projectsProperty ProtectionsExistingFebruary 26, 1901N/A
Marine Parkway Bridge protectionProperty ProtectionsCompletedApril 2, 1901N/A
Perimeter protection/drainage improvements and flood barriers for West Side Yard and East River tunnelsInfrastructure ProjectExistingJuly 14, 1910N/A
LIRR critical facilities protectionProperty ProtectionCompletedJuly 14, 1910N/A
Electrification of Tracks 7 and 8 in Long Island City YardInfrastructure ProjectExistingJune 7, 1902N/A
Portal floodgates for the East River tunnelsInfrastructure ProjectExistingJuly 14, 1910N/A
Drainage mitigation in LIRR track systemInfrastructure ProjectExistingJuly 14, 1910N/ARight-of-Way (ROW) Improvements - $12 million. LIRR will also make various right-of-way improvements, including work to address drainage and culvert deficiencies. This project also includes a project to repair or replace retaining walls along the ROW, which will further protect the track structure.
Track drainage on the Harlem LinePrevention and PolicyExistingJuly 14, 1910N/A
Baisley Park depot drainage improvementProperty ProtectionsCompletedJuly 14, 1910N/A
Dewatering of oil-water separators at the Grand Avenue depotPrevention and PolicyCompletedJuly 14, 1910N/A
JFK depot drainage improvementInfrastructure ProjectCompletedJuly 14, 1910N/A
NYCT Hurricane PlanPrevention and PolicyExistingJuly 14, 1910N/A
Flood planPrevention and PolicyExistingJuly 14, 1910N/A
DEP/NYCT station inspection and cleaning programPrevention and PolicyExistingJuly 14, 1910N/A
Staten Island Railway flood mitigationProperty ProtectionsExistingJuly 14, 1902N/AProjects in design/construction
Incremental Standards MitigationInfrastructure ProjectExistingJuly 14, 1910N/A
Flood mitigation and backup power for OCME Forensic Biology LaboratoryProperty ProtectionsPotentialJuly 14, 1910Medium1111000
FEMA flood mappingPrevention and PolicyExistingAugust 2, 1902N/AWork with FEMA on the Coastal Restudy is underway. Arcadis has been brought on board as the City’s consultant.
Communication of flood risksEducation and AwarenessCompletedJuly 14, 1910N/A
Future flood mappingPrevention and PolicyExistingMarch 3, 1901N/AOneNYC 2018 PR: Continue to work with FEMA, the NPCC, and relevant stakeholders to develop approaches for mapping future flood risks, incorporating sea level rise
Flood protection in Coney IslandInfrastructure ProjectExistingJuly 14, 1910N/A
Raised Shorelines CitywideInfrastructure ProjectExistingAugust 25, 1902N/A
Hospital Row flood protectionInfrastructure ProjectExistingJuly 14, 1910N/A
Flood protection project standardsPrevention and PolicyCompletedJuly 14, 1910N/A
Existing hospitals in the 500-year floodplainProperty ProtectionExistingJuly 14, 1910N/A
Existing nursing homes in the 100-year floodplainProperty ProtectionExistingJuly 14, 1910N/A
Existing adult care facilities in the 100-year floodplainProperty ProtectionExistingJuly 14, 1910N/A
Affordability issues related to reform of the NFIPPrevention and PolicyExistingJuly 8, 1900N/AOneNYC 2018 PR: Urge Congress to reauthorize the NFIP with NYC’s key concerns, including affordability and mitigation credits
Flood protection standards and certificationsProperty ProtectionsExistingMarch 3, 1901N/AOneNYC 2018 PR: Subject to FEMA’s release of the second phase of the guidance for buildings that cannot be elevated, the City will review and disseminate information
Mixed-use buildings as a building categoryProperty ProtectionsExistingMarch 3, 1901N/AOneNYC 2018 PR: Urge Congress to reauthorize the NFIP with NYC’s key concerns, including the recognition of mixed-use buildings as a distinct category
Mitigation creditsProperty ProtectionsExistingMarch 3, 1901N/AOneNYC 2018 PR: Subject to FEMA’s release of the second phase of the guidance for buildings that cannot be elevated, the City will advocate for mitigation credits
Higher deductibles for residential policyholdersPrevention and PolicyExistingJuly 14, 1910N/A As of the Homeowner Insurance Affordability Act of 2014, maximum deductible for single and two-to-four family residences increased to $10,000.
This is an advocacy/outreach project.
Flood insurance policy awarenessPrevention and PolicyExistingJuly 14, 1910N/A
Flood insurance engagement campaignEducation and AwarenessCompletedOctober 12, 1902N/A
Dunes on the Rockaway PeninsulaInfrastructure ProjectExistingJuly 14, 1910N/A
Sea Gate oceanfront protectionsInfrastructure ProjectExistingJuly 14, 1910N/A
Coney Island/Brighton Beach nourishmentPrevention and PolicyExistingJuly 14, 1910N/A
Manhattan Beach oceanfront protectionsPrevention and PolicyExistingJuly 14, 1910N/A
Study of mitigation of inundation risks through Rockaway InletPrevention and PolicyExistingJuly 14, 1910N/A
CUNY study and pilot of new technologies for high-rise buildingsPrevention and PolicyExistingJuly 14, 1910N/A
Resiliency of private cogeneration facilitiesEducation and AwarenessCompletedNovember 4, 1902N/A
Reinforcement of Belt Parkway edge protectionsInfrastructure ProjectExistingJuly 14, 1910N/A
Flood protection standards for telecommunications equipmentPrevention and PolicyExistingJuly 14, 1910N/A
Hardening power generators against floodingPrevention and PolicyExistingJuly 14, 1910N/A
Hardening electric transmission and distribution infrastructurePrevention and PolicyExistingJuly 14, 1910N/A
Hardening the natural gas system against floodingPrevention and PolicyExistingJuly 14, 1910N/A
Hardening steam plants against floodingPrevention and PolicyCompletedJuly 14, 1910N/A
Drainage improvements for Pump House # 4 and # 6 at LaGuardia AirportProperty ProtectionsExistingNovember 30, 1902N/ACorresponds to CA02-488 in PANYNJ's Capital Plan
Backflow preventers at PANYNJ-controlled buildings at JFK AirportProperty ProtectionsExistingDecember 8, 1902N/ACorresponds to CA03-783 in PANYNJ's Capital Plan
Drainage improvement at JFK AirportProperty ProtectionsCompletedJuly 14, 1910N/A
Drainage improvement at JFK AirportProperty ProtectionsExistingDecember 8, 1902N/ASee CA03-783 and CA03-766 in PANYNJ's Capital Plan
Facility upgrade at JFK AirportProperty ProtectionsExistingJuly 14, 1910N/ADesign is complete and bidding is expected by close of Q4 2018
Storm drainage rehabilitation at LaGuardia Airport, Phase IIIProperty ProtectionsCompletedDecember 26, 1902N/ACorresponds to CA02-486 in PANYNJ's Capital Plan
World Trade Center resiliency improvementsProperty ProtectionsExistingJune 22, 1901N/ASee CW11-028 and CW11-029 in PANYNJ's Capital Plan
Temporary flood mitigation measuresProperty ProtectionCompletedJuly 14, 1910N/A
Flood study of Long Island floodplainProperty ProtectionCompletedJuly 14, 1910N/A
Flood sensorsProperty ProtectionCompletedJuly 14, 1910N/A
Emergency generators for contingency support to flood-damaged substationsProperty ProtectionExistingJuly 14, 1910N/A
Seal Street OpeningsProperty ProtectionsExistingJuly 14, 1910N/A
Tunnel SealingProperty ProtectionsExistingJuly 14, 1910N/AProjects in design
Substation HardeningProperty ProtectionsExistingJuly 14, 1910N/AProjects in design
Yard Flood MitigationProperty ProtectionsExistingJuly 14, 1910N/AProjects in design
Pumping System ImprovementsProperty ProtectionsExistingJuly 14, 1910N/AProjects in design
Right-of-Way Equipment HardeningProperty ProtectionsExistingJuly 14, 1910N/AProjects in design/construction
Internal Station HardeningProperty ProtectionsExistingJuly 14, 1910N/AProjects in design/construction
Rockaway Line Flood MitigationProperty ProtectionsExistingMarch 3, 1901N/AProjects in design
Emergency Communications EnhancementsProperty ProtectionsExistingAugust 25, 1902N/AProjects in design
Flood Mitigation of Critical Support FacilitiesProperty ProtectionsExistingFebruary 22, 1903N/AProjects in design
Stapleton waterfront flood mitigationPrevention and PolicyCompletedFebruary 28, 1903N/AProject is completed. A portion of the wetlands were modified to be a mud flat due to erosion from tidal action.
Brooklyn Army Terminal passive flood barrier systemProperty ProtectionsExistingJuly 14, 1910N/AProject was awarded to Dewberry - Project was awarded to Dewberry in June 2017- Project is currently in design - projecting Construction Documents to be completed by Spring 2019.”
Coney Island Hospital flood-proofingProperty ProtectionsExistingMarch 12, 1903N/A
Coney Island Hospital emergency department mitigationProperty ProtectionsCompletedJuly 14, 1910N/A
Coney Island Hospital critical system protectionProperty ProtectionsExistingJuly 14, 1910N/A
Metropolitan Hospital flood barriersProperty ProtectionsPotentialJuly 14, 1910High1111000
Metropolitan Hospital critical systems elevationProperty ProtectionsPotentialJuly 14, 1910High1111100
Coler Hospital and Nursing Facility protectionProperty ProtectionsCompletedApril 2, 1903N/A
Gouverner Hospital (Roberto Clemente Clinic)Property ProtectionsCompletedOctober 6, 1900N/A
Coney Island Hospital Main Bldg. Renovation (1st Fl)Property ProtectionsCompletedApril 13, 1903N/A
Coney Island Hospital Main Bldg. Renovation (5th Fl)Property ProtectionsCompletedApril 13, 1903N/A
Coney Island Hospital BasementProperty ProtectionsExistingApril 22, 1903N/A
Coney Island Hospital (Off Site Parking)Property ProtectionExistingApril 26, 1903N/A
Coney Island Hospital (New Clinnical Service Bldg.)Property ProtectionsExistingMarch 12, 1903N/A
Coney Island Hospital (Rent MRI and CT Units)Property ProtectionsCompletedMarch 12, 1903N/A
Metropolitan Hospital/Electrical Switchgear upgradeEmergency ServicesExistingJuly 14, 1910N/A
Metropolitan Hospital/Cable Duct RelocationEmergency ServicesExistingJuly 14, 1910N/A
Metropolitan Hospital/Mitigation Perimeter Flood ProtectionProperty ProtectionExistingJuly 14, 1910N/A
Coler Hospital and Nursing Facility/Permanent Emergency GeneratorProperty ProtectionExistingJuly 14, 1910N/A
Coler Hospital and Nursing Facility/ Quick Connects and ACEmergency ServicesExistingJuly 14, 1910N/A
Coler Hospital and Nursing/Basment Crawl SpaceProperty ProtectionsExistingJuly 14, 1910N/A
Coler Hospital and Nursing/ Electric Panel ReplacementEmergency ServicesExistingJuly 14, 1910N/A
Coler Hospital and Nursing/ Fire pump reconstructionEmergency ServicesExistingJuly 14, 1910N/A
Coler Hospital and Nursing/ MitigationProperty ProtectionExistingJuly 14, 1910N/A
Zoning for flood-resistant construction, Phase I and IIPrevention and PolicyExistingJuly 14, 1910N/Ahttp://www1.nyc.gov/site/planning/plans/flood-resilience-zoning-text-update/flood-resilience-zoning-text-update.pageFlood Resiliency Zoning Text Amendment was approved by the City Council in Oct. 2013 on a temporary basis. Throughout 2017 and into 2018, DCP engaged with communities to the floodplain learn from their experiences and is currently in the process of developing a proposal for a permanent Flood Resiliency Zoning Text Amendment.
Croton Falls pump station rehabilitationInfrastructure ProjectCompletedMay 15, 1902N/A
Resilient IndustryPrevention and PolicyCompletedJune 11, 1903N/Ahttp://www1.nyc.gov/site/planning/plans/resilient-industry/resilient-industry.page
Flood ManualPrevention and PolicyExistingJuly 14, 1910N/AIn progress
Data system upgradeEmergency ServicesExistingAugust 26, 1901N/AOngoing
Flood-proofing 125 Worth Street vaultProperty ProtectionsExistingJuly 14, 1910N/A
Modifications to MTS facilities being builtProperty ProtectionsExistingApril 21, 1903N/AMitigations such as raising electrical panels above flood level, adding submersible capstans, flood proof doors, and generators were added to the design.
Protection for the Manhattan 1,2,5 facilityEmergency ServicesCompletedJuly 6, 1903N/AInsertion of water panels to mitigte sea level rise infiltration (original design). These are manually placed by hand. Not automated as originally requested.
New construction Existing Building flood mitigationProperty ProtectionsExistingJuly 12, 1903N/A
Ventilation grate and tunnel pump room improvementsInfrastructure ProjectCompletedJuly 18, 1903N/AIn recent years, the LIRR has made significant progress on this category with the completion of structural renewal on the Atlantic Avenue Viaduct.
Permeable pavementInfrastructure ProjectExistingJuly 14, 1910N/ADue to schedule delays owing to various factors including unacceptable soil conditions at tested locations, NYCDOT was no longer eligible for the previously awarded NYS GIGP grants. NYCDOT is proceeding with the permeable sidewalk pilot project using NYCDOT Expense funding for design; the project is in the geotechnical analysis stage. NYCDEP is now doing the permeable pavement roadway pilot project.

Cost listed above refers to pilot installation.
Infrastructure flood protectionProperty ProtectionsPotentialJuly 14, 1910Medium1111110
Ecologically sensitive industrial area planningCoastal/Natural ResourcesPotentialJuly 14, 1910High1111010
Bergen Basin and Tallman Island Wastewater Treatment Plant drainage upgradesInfrastructure ProjectExistingAugust 4, 1903Medium
Server capacity improvementsProperty ProtectionsExistingAugust 11, 1903
Electrical Improvements for City-Owned FacilitiesProperty ProtectionsPotentialJuly 14, 1910Medium0-111-110
Rikers Island roadway re-gradingInfrastructure ProjectExistingApril 28, 1900Medium
Water infiltration preventionProperty ProtectionsPotentialJuly 14, 1910High1111111
Olmsted Center ReconstructionProperty ProtectionsExistingSeptember 2, 1903https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/5504
Tidegate upgrade in Flushing Meadow Corona ParkEmergency ServicesCompletedSeptember 9, 1903High
Flood effects reduction programProperty ProtectionExistingJuly 14, 1910Medium
Flood Mitigation for Critical City-Owned FacilitiesProperty ProtectionsPotentialJuly 14, 1910High1-111110
Water infiltration studyEmergency ServicesExistingJuly 14, 1910Medium
Long Island City Yard protectionProperty ProtectionsExistingSeptember 25, 1903MediumThe first phase of the Long Island City yard project will start construction in 4th quarter 2017 for removal & restoration of tracks 9-12, soil remediation, and tracks 7 & 8 third rail safety interlock. The second phase consisting of construction of flood wall gates, pumping system and restoration of track 11 & 12 will start after completion of the first phase.
Safeguarding NYCHA cellar equipmentProperty ProtectionsExistingOctober 2, 1903Mediumhttp://www1.nyc.gov/site/nycha/about/recovery-resiliency.page
NYCHA floodgates and barriersProperty ProtectionsExistingOctober 2, 1903Mediumhttp://www1.nyc.gov/site/nycha/about/recovery-resiliency.page
NYCHA boiler rooms and electrical equipmentProperty ProtectionsExistingOctober 2, 1903Mediumhttp://www1.nyc.gov/site/nycha/about/recovery-resiliency.page
Sump pump protectionProperty ProtectionsPotentialJuly 14, 1910High1111110
Building electrical protection - 60th PctProperty ProtectionsCompletedFebruary 28, 1903Medium
Boiler protection - Property ClerkProperty ProtectionsExistingJuly 14, 1910Medium
Relocation of OCME Disaster-Response Equipment and Vehicles from Staging Location at 18th Street and FDR DriveProperty ProtectionsPotentialJuly 14, 1910Medium1011000
Local storm surge barrier for Gowanus CanalInfrastructure ProjectExistingJuly 14, 1910High
Plan for flood protection along the Williamsburg, Greenpoint, and Long Island City coastlinesInfrastructure ProjectExistingJuly 14, 1910High
Breezy Point Risk Mitigation SystemsInfrastructure ProjectExistingNovember 10, 1903HighOneNYC 2018 PR: Reach 30 percent design
Offshore breakwaters adjacent to and south of Great Kills HarborInfrastructure ProjectCompletedJuly 14, 1910High
Hunts Point Resiliency StudyPrevention and PolicyExistingNovember 21, 1903huntspointresiliency.nyc
Flood protection in East HarlemInfrastructure ProjectPotentialJuly 14, 1910Medium1111000OneNYC 2018 PR: Present short-, medium-, and long-term plan, and flood protection and drainage system concepts to the East Harlem community
Lower Manhattan Coastal ResiliencyInfrastructure ProjectExistingDecember 1, 1903Mediumhttps://www1.nyc.gov/assets/lmcr/downloads/pdf/180718_FINAL_Two%20Bridges_CB3%20workshop%20R4.pdf
Integrated flood protection system for Red HookInfrastructure ProjectExistingJuly 14, 1910Mediumhttps://www.nycedc.com/sites/default/files/filemanager/Projects/rh_ifps/Public_Meeting_4/RH_IFPS_Summary_Brochure_June_2017.pdfA design RFP is currnetly being prepard.
Protection of Farragut substationInfrastructure ProjectCompletedJuly 14, 1910High
Newtown Creek flood protectionInfrastructure ProjectCompletedJuly 14, 1910High
Flood protection researchPrevention and PolicyExistingJuly 14, 1910High
Prevention of drainage pipe floodingPrevention and PolicyExistingJuly 14, 1910High
Floodgate at Mill CreekInfrastructure ProjectExistingJuly 14, 1910High
Community Rating SystemPrevention and PolicyPotentialJuly 14, 1910Medium1011000
Coney Island Creek wetlands and tidal barrierInfrastructure ProjectCompletedJanuary 3, 1904HighThis is a feasiblility study which is complete
Lower Manhattan Coastal Resilency - South of Brooklyn BridgePrevention and PolicyExistingJuly 14, 1910Highhttps://www1.nyc.gov/assets/lmcr/downloads/pdf/LMCRCB1Briefing4.17.184PM.PDFOneNYC 2018 PR: Complete Conceptual Design for the South Street Seaport and the Battery
OneNYC 2018 PR: Investigate feasibility of IFPM in the Seaport
OneNYC 2018 PR: Advance schematic design for Two Bridges
OneNYC 2018 PR: Release RFP and begin final design for Two Bridges
OneNYC 2018 PR: Complete Long-Term Strategy Plan for LMCR
Flood protection of vital infrastructure at LaGuardia AirportProperty ProtectionsCompletedJanuary 15, 1904MediumCorresponds to CA02-486 in PANYNJ's Capital Plan
Flood protection of vital infrastructure at JFK AirportProperty ProtectionsExistingJuly 14, 1910Medium
Protection of JFK Airport fuel farm tanksInfrastructure ProjectPotentialJuly 14, 1910High1111111
LaGuardia Airport dike wallInfrastructure ProjectPotentialJuly 14, 1910Medium1111100
JFK Airport sanitary lift stationProperty ProtectionsPotentialJuly 14, 1910High1111101
JFK Airport runway upgradeProperty ProtectionCompletedJuly 14, 1910Medium
JFK Airport runway upgradeProperty ProtectionsExistingJuly 14, 1910Medium
Improvements to George Washington Bridge anchorage drainage systemProperty ProtectionsPotentialJuly 14, 1910Medium1111101
Substation mitigationInfrastructure ProjectExistingJuly 14, 1910Medium
Brooklyn 3 New GaragePrevention and PolicyPotentialJuly 14, 1910Medium0111000
Manhattan 6/6A/8 New GaragePrevention and PolicyPotentialJuly 14, 1910Medium0101100Address not determined
Bronx 9/10/11 New GaragePrevention and PolicyPotentialJuly 14, 1910Medium0111100
Intake Process UpdateEmergency ServicesPotentialAugust 23, 1908Medium1011001
Renewable Energy for Supportive HousingProperty ProtectionsPotentialSeptember 6, 1908Medium111101-1
Emergency Backup GeneratorsEmergency ServicesPotentialSeptember 29, 1908High1111101
Verizon Network Transformation (copper to fiber migration)Infrastructure ProjectExistingFebruary 26, 1909This action replaces the item IF.E.013. Cost Estimate TBD
Cogeneration Equipment at North River Wastewater Treatment PlantEmergency ServicesExistingJuly 14, 1910N/A
Citywide VOIPPrevention and PolicyCompletedJuly 14, 1910N/A
Fuel infrastructure hardeningPrevention and PolicyCompletedJuly 14, 1910N/A
Post-emergency restoration for fuel infrastructurePrevention and PolicyCompletedJuly 14, 1910N/A
Breezy Point storm damage restorationProperty ProtectionCompletedJuly 14, 1910N/A
Expansion of CogenerationEmergency ServicesExistingJuly 14, 1910N/A
Repair of the Delaware Aqueduct leakInfrastructure ProjectExistingMarch 24, 1904N/A
Solar Power Feasibility StudyEmergency ServicesExistingJuly 14, 1910N/ADCAS owns the citywide study- it doesn't provide back-up energy but offsets demands.
Solar Power SystemEmergency ServicesExistingMarch 24, 1904N/AThis doesn't provide back-up energy, but does offset demand. 110 under contract to be installed
Backup generators for gas stations and terminalsEmergency ServicesExistingJuly 14, 1910N/AAs part of the FuelNY program, NYC now has over 200 gas station with either quick-connect for generators or permanent generators installed to ensure fueling capabilities when there are widespread power outages.
NY City Telecommunications Services (DoITT MSA)Infrastructure ProjectExistingNovember 4, 1902Added additional services
Utilities on Buono BridgeProperty ProtectionsCompletedApril 22, 1904Low
Facility electrical power and data infrastructure upgradeInfrastructure ProjectPotentialJuly 14, 1910High1111101
DOHMH generators and retrofitsEmergency ServicesExistingJuly 14, 1910
Session Initiation Protocol (SIP)Infrastructure ProjectPotentialJuly 14, 1910High1111101
Citywide Interactive Voice Response (IVR) for employee announcementsEmergency ServicesPotentialJuly 14, 1910High1111100
Telecommunications Planning and Resiliency OfficeInfrastructure ProjectCompletedMay 9, 1904High
IP routing networkInfrastructure ProjectCompletedMay 14, 1904HighThe network has been hardened with the industry leading BGP routing protocol and the Internet bandwidth is being upgraded to 40 Gbps.
Emergency generators in NYCHA propertiesEmergency ServicesExistingOctober 2, 1903Mediumhttp://www1.nyc.gov/site/nycha/about/recovery-resiliency.page
Backup generator for 100th PctEmergency ServicesExistingJuly 14, 1910Medium
Long-Term Relocation Contingency for OCME Manhattan FacilitiesInfrastructure ProjectPotentialJuly 14, 1910Medium1011000
Flood Mitigation and Emergency Power at OCME Brooklyn and Queens Forensic Pathology CentersEmergency ServicesPotentialJuly 14, 1910Medium1011000
Generator assessment and installation of quick-connects for critical infrastructureEmergency ServicesExistingJune 5, 1904Medium1011000The surveys have been completed at the 44 Evacuation Centers as of June 2018. NYCEM is surveying additional standalone shelters and expect to have another 45 surveys complete by June 2020.
Distributed generation (DG) and micro-gridsPrevention and PolicyCompletedJuly 14, 1910High
Purchase of mobile substationProperty ProtectionCompletedJuly 14, 1910High
Purchase of mobile switchgearProperty ProtectionCompletedJuly 14, 1910High
Second Inter-agency Office for EmergenciesEmergency ServicesPotentialJuly 14, 1910Medium1111000
Displacement ProtectionProperty ProtectionsExistingSeptember 25, 1908
Public Address (PA) SystemEmergency ServicesPotentialSeptember 29, 1908High1111001
Emergency Safety NoticesEducation and AwarenessPotentialSeptember 6, 1908High111111-1
Emergency Procedure Response InformationEducation and AwarenessPotentialSeptember 29, 1908High1111-111
Amplifying Disability Specific Emergency MessagingEmergency ServicesExistingJuly 14, 1910https://www1.nyc.gov/site/mopd/resources/emergency-preparedness.page
MOPD Disaster Resilience and Resource NetworkEducation and AwarenessExistingJuly 14, 1910https://www1.nyc.gov/site/mopd/resources/mopd-disaster-resilience-and-resource-network.pageCost is for ASL interpreter and CART services - about $500 per meeting.
Accessible TransportationPrevention and PolicyExistingJuly 14, 1910https://www1.nyc.gov/site/mopd/resources/transportation.page
Inclusive Design Guidelines (IDG) 2nd EditionPrevention and PolicyCompletedApril 4, 1904https://www1.nyc.gov/site/mopd/initiatives/inclusive-design-guidelines.page
ClimAID AssessmentEducation and AwarenessCompletedJuly 14, 1910https://www.nyserda.ny.gov/climaid
NYS Climate Change Science ClearinghouseEducation and AwarenessCompletedJuly 14, 1910www.nyclimatescience.org
Climate Change Impacts on NYS's Buildings SectorEducation and AwarenessExistingJuly 8, 1900ap.buffalo.edu/adapting-buildings
Building-Resilience Assessment for NYCHAEducation and AwarenessExistingJune 15, 1906
Effects of Climate Change on Renewable Energy Distribution in NYSEducation and AwarenessExistingOctober 24, 1900
Climate Change Vulnerabilities of and Adaptation Strategies for NYS's Future Electric SystemEducation and AwarenessExistingMarch 3, 1901
15 MetroTech 12th Floor for Backup SiteEmergency ServicesExistingJuly 14, 1910
Remediation of Park Slope DAFN ComplaintEmergency ServicesPotentialJuly 14, 1910Medium1011000
Crisis Management Tool UpgradeEmergency ServicesPotentialJuly 14, 1910High1111110
Tool for Real-Time Collection of Information - IoT Devices and SensorsPrevention and PolicyPotentialJuly 14, 1910Medium1111000
Smart PolesInfrastructure ProjectPotentialJuly 14, 1910High1111000
Housing Recovery OfficePrevention and PolicyPotentialJuly 14, 1910Medium1001010
Protocol for Monitoring Nature-Based ShorelinesEducation and AwarenessExistingMarch 3, 1901
Complete Short-term Beach Nourishment, Dune Construction, and Shoreline Protection on Staten Island (M)Coastal/Natural ResourcesCompletedNovember 16, 1909https://www1.nyc.gov/site/sirr/report/report.page
Increase Growth of Local Plant Material for Restoration WorkCoastal/Natural ResourcesCompletedJune 5, 1900https://www1.nyc.gov/site/sirr/report/report.page
Spring Creek ParkCoastal/Natural ResourcesExistingMarch 8, 1909http://www.nan.usace.army.mil/Spring-Creek-Park/
Hudson Raritan Esturary (HRE) NY and NJ Ecosystem Restoration ProgramCoastal/Natural ResourcesExistingJune 22, 1901http://www.nan.usace.army.mil/Media/Fact-Sheets/Fact-Sheet-Article-View/Article/647240/hudson-raritan-estuary-hre-ny-and-nj-ecosystem-restoration-program/
Location information: 25 Mile Radius of the Statue of Liberty National Monument
Hart Island ShorelineCoastal/Natural ResourcesPotentialAugust 10, 19091111111
Hunters Point SouthCoastal/Natural ResourcesCompletedJuly 8, 1900https://www.nycedc.com/press-release/city-opens-sprawling-55-acre-waterfront-park-hunters-point-south-long-island-city
MARSHES Mitigation Banking Pilot (Saw Mill Creek)Coastal/Natural ResourcesExistingMay 16, 1902https://www.nycedc.com/project/marshes-initiative
Coney Island Creek Raised ShorelineCoastal/Natural ResourcesExistingNovember 10, 1903
Design and Planning for Flood Resiliency: Guideline for NYC ParksPrevention and PolicyCompletedNovember 23, 1909https://www.nycgovparks.org/planning-and-building/planning/resiliency-plans/flood-resiliency
Emergency Protective Measures on Staten Island (M)Coastal/Natural ResourcesCompletedNovember 30, 1909
Create a Strategic Plan for Public Recreational Land, including the Beachfront Recreation Areas and Open SpaceCoastal/Natural ResourcesCompletedJuly 14, 1910https://www.nycgovparks.org/planning-and-building/planning/conceptual-plans/east-shore-shoreline-parks-plan
Riverside Park and Fort Washington Park Pathway Reconstruction (Hurricane Sandy)Infrastructure ProjectExistingJuly 14, 1910https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6178
Ralph Demarco Park Shoreline Reconstruction (Hurricane Sandy)Infrastructure ProjectExistingDecember 28, 1909https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/6170
Bayswater ParkInfrastructure ProjectExistingMay 15, 1910
Wolfe's Pond Park Landscape ReconstructionInfrastructure ProjectExistingOctober 6, 1905https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/5963
Disaster Recovery Site Hardware UpgradeInfrastructure ProjectPotentialJuly 29, 1900High1111101
Backup software/hardware updgradeInfrastructure ProjectPotentialJuly 29, 1900High1111101
All Terrain VehiclesEmergency ServicesPotentialSeptember 6, 1908Medium111100-1
Backup generator - PSA 1Emergency ServicesPotentialJuly 14, 1910Medium1111-1-10After design and estimates PSA 1 was removed due to the lack of funding.
Back-up generator - 60th PctEmergency ServicesExistingJuly 14, 1910
Backup Generator - 112 PctEmergency ServicesPotentialJuly 14, 1910Medium1111-1-10After design and estimates 112 pct was removed due to lack of funding.
Backup Generators - 5th Pct & 25th PctEmergency ServicesExistingAugust 19, 1909
Backup Generator at the 70th Pct and 30th PctEmergency ServicesPotentialJuly 14, 1910High1111000
Installation of Hardened Telecommunications Shelters Infrastructure ProjectPotentialJuly 14, 1910High1011101
Climate Resiliency Design GuidelinesPrevention and PolicyExistingJuly 14, 1910https://www1.nyc.gov/assets/orr/pdf/NYC_Climate_Resiliency_Design_Guidelines_v2-0.pdf
OCME Radio Communications and Agency Operations Center UpdateEmergency ServicesPotentialJuly 14, 1910High1111100
Mitigation of latent salt damageInfrastructure ProjectExistingMarch 31, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/Corresponds to CB02-225 in PANYNJ's Capital Plan
Mitigation of latent salt damage (Hurricane Sandy).Infrastructure ProjectExistingApril 4, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds to CB02-226 in PANYNJ's Capital Plan
Mitigation of latent salt damageInfrastructure ProjectExistingApril 8, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds to CB03-285 in PANYNJ's Capital Plan
Mitigation of latent salt damage Infrastructure ProjectExistingApril 8, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds to CB03-286 in Capital Plan
Replacement of aeronautical operations area light circuitEmergency ServicesExistingApril 13, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds to CA02-484 in PANYNJ's Capital Plan
Rehabilitation of pump house 6 substation.Infrastructure ProjectExistingNovember 30, 1902https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds to CA02-488 in PANYNJ's Capital Plan
Repair & hazard mitigationInfrastructure ProjectExistingApril 23, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds CA03-764 in PANYNJ's Capital Plan
Replacement of airside switchgearsInfrastructure ProjectExistingApril 27, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds to CA03-765 in PANYNJ's Capital Plan
Installation of tide gates/drainage check valves for outfalls.Property ProtectionsExistingMay 16, 1902https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/Corresponds to CA03-766 in PANYNJ's Capital plan
Replacement of light circuit at aeronautical operational area.Infrastructure ProjectExistingMay 4, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/Corresponds to CA03-769 in PANYNJ's Capital Plan
Installation of floodgates at outfalls.Property ProtectionsExistingDecember 8, 1902https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
CA03-783 corresponds to PANYNJ's Capital Plan
Replacement of underground electrical delivery lines at new york marine terminal.Infrastructure ProjectExistingJune 22, 1901https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/ Corresponds to number CP09-125 in PANYNJ's Capital Plan
Upgrade of pavement subgrade at howland hook marine terminal.Infrastructure ProjectExistingMay 13, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds to CP11-089 in PANYNJ's Capital Plan
Replacement of signals in tunnels E & FInfrastructure ProjectExistingMay 18, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/Corresponds to CR02-589 in PANYNJ's Capital Plan
Replacement of radio and electronics in tunnels E & FEmergency ServicesExistingMay 18, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/Corresponds to CR02-590 in PANYNJ's Capital Plan
Replacement of 27kv, 15kv, traction power and inter-tripping cables in tunnels E & FInfrastructure ProjectExistingMay 18, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/Corresponds to CR02-591 in PANYNJ's Capital Plan
Replacement of lighting 480v power distribution equipment in tunnels E & FInfrastructure ProjectExistingMay 18, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/Corresponds to CR02-592 in PANYNJ's Capital Plan
Replacement of corrosion protection and control system in tunnels E & FInfrastructure ProjectExistingMay 18, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/
Corresponds to CR02-594 in PANYNJ's Capital Plan
Replacement of track, third rail and appurtenances in tunnels E & FInfrastructure ProjectExistingMay 18, 1909https://corpinfo.panynj.gov/documents/Capital-Plan-2017-2026/Corresponds to CR02-595 in PANYNJ's Capital Plan
79th Street Boat Basin Dock A Reconstruction (M071-310M)Property ProtectionsCompletedFebruary 11, 1900https://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/2363
Agency Vehicle ReplacementEmergency ServicesExistingJuly 14, 1910
Window Replacement at PSA 1Property ProtectionsExistingJuly 14, 1910
Downscaled Projections of Extreme RainfallEducation and AwarenessCompletedJuly 14, 1910http://ny-idf-projections.nrcc.cornell.edu/idf_viewer.html
Redundant emergency generatorsEmergency ServicesCompletedJuly 14, 1910N/A
Bellevue Hospital power quick connectsEmergency ServicesCompletedApril 12, 1903High
Henry J. Carter Hospital improvementsEmergency ServicesCompletedJuly 14, 1910High
Green zoning regulationsPrevention and PolicyCompletedJuly 3, 1904N/A
Parking lot stormwater managementPrevention and PolicyCompletedJuly 14, 1910N/A
Hazard mitigation planning and zoningPrevention and PolicyCompletedJuly 14, 1910N/A
Waterfront open spaceCoastal/Natural Resource ProtectionCompletedJuly 14, 1910N/A
Waterfront Revitalization Program consistencyPrevention and PolicyCompletedJuly 14, 1910N/A
Front yard planning requirementsPrevention and PolicyCompletedJuly 14, 1910N/A
Street tree requirementsCoastal/Natural Resource ProtectionCompletedJuly 14, 1910N/A
Tree plantingCoastal/Natural ResourcesCompletedMarch 6, 1903N/Ahttps://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8685The Millionth tree was planted in 2015 - a recognition event was head in December 2015; Mayor DeBlasio pledged another 100,000 trees.
Advanced warning systemEmergency ServicesCompletedJuly 14, 1910N/A
Construction Code revisionPrevention and PolicyCompletedAugust 23, 1904N/A
Construction Code revisionPrevention and PolicyCompletedAugust 23, 1904N/A
Construction Code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
Construction Code revisionPrevention and PolicyCompletedAugust 23, 1904N/A
Riverside clinic upgradeProperty ProtectionsCompletedSeptember 9, 1904MediumAll work completed and tested.
Emergency power generatorsEmergency ServicesCompletedJuly 14, 1910N/APreliminary standard operating procedures for any forcasted event that threatens facilities.
59th Street MTS - Repair and Flood Hazard MitigationPrevention and PolicyCompletedSeptember 21, 1904N/AFloodproofing for pier electrical room, Emergency generator ablove FEMA flood elevation, submersable capstans
Queens 14 - Repair and Flood Hazard MitigationPrevention and PolicyExistingSeptember 27, 1904N/AElevated switchgear and transformer
Voice-over IP (VOIP) architectureEmergency ServicesCompletedOctober 12, 1902MediumVOIP does not support FDNY firehouse Centrex lines or any centrex lines- VOIP is in service (provided by Verizon)at the backup FDOC in Staten Island
Fire Department Operations Center (FDOC) cell phone coverageEmergency ServicesCompletedNovember 4, 1902Low
Cache of vaccinationsEmergency ServicesCompletedJuly 14, 1910MediumThe FDNY Emergency Medical Service maintains a cache of WMD antidote to treat upwards of 100,000 people and responders in the event of a WMD-type attack.
Urban search and rescue teamEmergency ServicesCompletedOctober 12, 1902Medium
Operations/communications redundancyEmergency ServicesCompletedJuly 14, 1910N/A
Traffic signal and street light equipmentProperty ProtectionsCompletedJuly 14, 1910N/A
Pedestrian and bicycle facilitiesInfrastructure ProjectCompletedJuly 14, 1910N/A
Continuity of Operations sitesEmergency ServicesCompletedJuly 14, 1910Medium
Information trackingEmergency ServicesCompletedJuly 14, 1910High
Regulatory actions on liquid fuel shortagesEmergency ServicesCompletedJuly 14, 1910N/A
Urban Post-Disaster Housing Prototype ProgramEducation and AwarenessCompletedJuly 14, 1910N/A
Urban Post-Disaster Housing prototypePrevention and PolicyCompletedJuly 14, 1910N/AComplete. Analysis of building systems is complete. The occupancy study in collaboration with NYU Tanner School of Engineering will be completed in March 2016. The prototype will remain on site at NYCEM through 2017.
Ready New York Mobile AppEducation and AwarenessCompletedJuly 14, 1910N/A
Conversion of asphalt fields to natural or synthetic turf fieldsProperty ProtectionCompletedJuly 14, 1910N/A
Improved weather forecastingEmergency ServicesExistingJuly 14, 1910N/A
Vegetation Management ProgramCoastal/Natural Resource ProtectionExistingJuly 14, 1910N/A
Improved Con Ed communicationsEmergency ServicesExistingJuly 14, 1910N/A
Load-reduction programsPrevention and PolicyExistingJuly 14, 1910N/A
Con Ed cyber securityPrevention and PolicyExistingJuly 14, 1910N/A
CUNY stakeholder outreachEducation and AwarenessExistingJuly 14, 1910N/A
Protection of City's fuel supplyEmergency ServicesCompletedFebruary 27, 1903N/A
Resiliency of food supplyEmergency ServicesExistingJuly 14, 1910N/APost Sandy, turn-key contracts were put in place to help operationalize local and regional assets for NYC-specific responses.
City fueling during emergenciesEmergency ServicesCompletedOctober 12, 1902N/A
Inter-agency fuelingEmergency ServicesCompletedJanuary 19, 1905N/A
Fuel rationingEmergency ServicesExistingJuly 14, 1910N/AEvaluated on a case by case basis
Open Industrial Uses StudyPrevention and PolicyCompletedJuly 14, 1910N/ADraft report issued in 2014
Coastal Zone ManagementPrevention and PolicyCompletedJuly 14, 1910N/A
Green infrastructureCoastal/Natural Resource ProtectionExistingFebruary 13, 1905N/A
BluebeltsCoastal/Natural ResourcesExistingJuly 14, 1910N/A
Interconnection between the Catskill and Delaware AqueductsInfrastructure ProjectCompletedJune 12, 1900N/A
Bridge reconstruction and stabilizationProperty ProtectionsExistingJune 22, 1901N/A
Dam reconstructionInfrastructure ProjectExistingJune 22, 1901N/A
Mapping and analysis enhancementEmergency ServicesExistingJuly 14, 1910N/A
Public education on emergency preparedness and hazard mitigation actionsEducation and AwarenessExistingJuly 14, 1910N/A
Public outreach to seniorsEducation and AwarenessExistingJuly 14, 1910N/A
Emergency planning and hazard mitigation literatureEducation and AwarenessExistingJuly 14, 1910N/A
Supplementation of Emergency Communications EquipmentEmergency ServicesExistingJuly 14, 1910N/A
Existing building code revisionPrevention and PolicyExistingJuly 14, 1910N/A
Interagency coordinationPrevention and PolicyExistingJuly 14, 1910N/A
DOB staff developmentPrevention and PolicyExistingJuly 14, 1910N/A
DOB trainingPrevention and PolicyExistingJuly 14, 1910N/A
Construction Code revisionPrevention and PolicyExistingJuly 14, 1910N/AKicked off at the beginning of 2016. Committees are currently reviewing proposed changes.
Cogeneration plantEmergency ServicesCompletedJune 12, 1900N/A
Emergency power upgrades and replacementsProperty ProtectionsCompletedJune 12, 1900N/A
Redundant communicationsEmergency ServicesCompletedApril 4, 1904N/A
NYC Community Air Survey (NYCCAS)Emergency ServicesExistingJuly 14, 1910N/A
Citywide health and safety program for large-scale emergenciesEmergency ServicesExistingJuly 14, 1910N/A
Environmental emergency preparednessEmergency ServicesExistingJuly 14, 1910N/A
Real-time surveillance of health outcomesPrevention and PolicyExistingJuly 14, 1910N/A
Public health information for healthcare providersEmergency ServicesExistingJuly 14, 1910N/A
Public health risk communication for the general publicEducation and AwarenessExistingJuly 14, 1910N/A
Interagency field and environmental data gathering and exchangeEmergency ServicesExistingJuly 14, 1910N/AOngoing
Interagency environmental data workshopEducation and AwarenessExistingJuly 14, 1910N/ASuspended for time being
Health Code revisionsPrevention and PolicyExistingJuly 14, 1910N/AOngoing
Climate change and public health assessmentPrevention and PolicyExistingJuly 14, 1910N/AOngoing
Climate and health community resilienceEducation and AwarenessExistingJuly 14, 1910N/AOngoing
Environmental health tracking portalEducation and AwarenessExistingJuly 14, 1910N/A
Environmental monitoring information telemetry systemEmergency ServicesExistingJuly 14, 1910N/Acost is 45000 per year
Assessing and communicating risks from drinking and recreational watersEducation and AwarenessExistingJuly 14, 1910N/A
Public education on mental healthEducation and AwarenessExistingJuly 14, 1910N/A
Mental health system IT record redundancyEmergency ServicesCompletedJuly 14, 1910N/A
Public safety land-mobile radio communications at the World Trade CenterInfrastructure ProjectPotentialJuly 14, 1910High1111101Awaiting Capital Plan allocation from DoITT Budget and Exec Management
311 upgradeEmergency ServicesExistingJuly 14, 1910N/A
311 alternate siteEmergency ServicesPotentialJuly 14, 1910High1111101
Hardening the optical backbonePrevention and PolicyPotentialJuly 14, 1910High1111100
Internet/DMZ managementPrevention and PolicyCompletedAugust 9, 1905N/A
Protection of New York City bridges from hazardsProperty ProtectionsExistingJuly 14, 1910N/AThe movable bridge contract is underway and several of the City's movable bridges have been returned to full service. Work is scheduled to be complete by the end 2018.
Incorporation of climate resiliency features in DOT capital projectsPrevention and PolicyExistingJuly 14, 1910N/ANYCDOT incorporated resiliency/ climate adaptation in the new and revised Street Design Manual 3.0 in 2018. The roadway reconstruction scoping process from NYCDOT to DDC now includes flood risk and sea level rise as design consideration for DDC. Toolbox elements will be further incorporated as they are developed. This is unchanged. This work is ongoing.

Cost estimate TBD.
Resiliency in DOT planningInfrastructure ProjectExistingJuly 14, 1910N/AAs indicated in MH.E.70 and MH.E.71, NYCDOT continues to integrate resiliency into its planning process for capital projects using the Street Design Manual and the New York City Climate Resiliency Design Guidelines.

Cost estimate TBD.
Protection of ferry terminalsProperty ProtectionsExistingSeptember 2, 1905N/AFTA and City-funded resiliency project to mitigate against future flooding damage to Whitehall and St. George ferry terminals continues. Design started March 18, 2018. Anticipated design completion in July 2019.
Ferry use during emergenciesInfrastructure ProjectExistingJuly 14, 1910N/ANote that all modifications to landings are EDC responsibility. NYCDOT Austen Class vessels are ready to be deployed if warranted. Could be combined with MH.E.173. NYCEDC, in coordination with NYCDOT, is in the process of procuring a design consultant for several FTA Sandy Resilience-funded landing upgrade projects along the City’s East River Ferry route and other ferry facilities to better support Staten Island Ferry vessels and other ferries. These landing facility upgrades will be at Brooklyn Cruise Terminal, East 34th Street and Hunters Point South.
Emergency traffic managementPrevention and PolicyExistingJuly 14, 1910N/AThe City has developed and regularly updates plans for traffic and transit management strategies in the wake of major system disruptions, including storms, blizzards, a maritime emergency and a transit strike. The City regularly holds tabletop preparedness exercises. NYC DOT conducts annual updates of its Coastal Storm, Snow, and Conntinutiy of Operations plans. NYCDOT maintains a highway ITS capability, including trafic camera, electronic messag boards, and joint operation (along with NYPD and NYSDOT) of the NYC Joint Transportation Management Center.
Bus Priority StrategiesPrevention and PolicyExistingJuly 14, 1910N/AThe City and the MTA continue to expand Select Bus Service (SBS), there are currently 12 SBS routes in operation. The City will continue planning, design, community outreach, and implementation to meet its goal of implementing 20 SBS routes by 2020. Beyond SBS, 125 bus countdown clocks were installed in 2016, with 225 additional units scheduled to be in place by the end of 2017.
Green Infrastructure in ParkslandsPrevention and PolicyCompletedOctober 6, 1900N/A
Street treesPrevention and PolicyCompletedJune 22, 1901N/Ahttps://www.nycgovparks.org/planning-and-building/capital-project-tracker#Citywide
ReforestationCoastal/Natural ResourcesExistingOctober 6, 1905N/Ahttps://www.nycgovparks.org/planning-and-building/capital-project-tracker/project/8868
Tree pruningCoastal/Natural ResourcesCompletedJuly 14, 1910N/Ahttps://www.nycgovparks.org/services/forestry/tree-pruning
Green roofsProperty ProtectionsExistingJuly 14, 1910N/A
EDC emergency power generatorsEmergency ServicesExistingJuly 14, 1910N/AEstimate complete for Hunts Point Food distrobution center. Funding source TBD
Expansion of ferry landings available for regular and emergency use.Infrastructure ProjectExistingJuly 14, 1910N/A
Infrastructure upgrade Ferry LandingsPrevention and PolicyExistingJuly 14, 1910N/A$55M City wide ferry service is under construction adding more than 20 ferry landings and expected to be fully operational in 2018
Infrastructure upgrade Arthur KillInfrastructure ProjectExistingJuly 14, 1910N/A
Power redundancy at FDNY facilitiesEmergency ServicesExistingNovember 9, 1905N/A70% have back up generators that can power the entire building. (72 hour fuel supply)
Water supply redundancyEmergency ServicesExistingMarch 20, 1902N/A
Enterprise Asset Management SystemProperty ProtectionsExistingMarch 3, 1901N/AFive (5) units are up and running. More to follow.
Continuity of Operations Plan (COOP)Emergency ServicesExistingJuly 14, 1910N/A
Emergency action plansEmergency ServicesExistingMarch 3, 1901N/A
IT disaster recoveryEmergency ServicesCompletedOctober 12, 1902N/A
LIRR tree pruningCoastal/Natural Resource ProtectionExistingJuly 14, 1910N/A
MNR tree pruningCoastal/Natural Resource ProtectionExistingJuly 14, 1910N/A
Harlem River lift bridgeInfrastructure ProjectExistingJuly 14, 1910N/A
Summer operations manualPrevention and PolicyExistingJuly 14, 1910N/A
Storm surge/flooding mapping/design guidelines/standardsPrevention and PolicyExistingJuly 14, 1910N/A
MNR advance warningEmergency ServicesExistingJuly 14, 1910N/A
Contingency planning for substitute bus serviceEmergency ServicesPotentialJuly 14, 1910Medium1111000
Bus command center and radio systemEmergency ServicesExistingJuly 14, 1910N/AThese are two separate projects funded in both the NYCT and MTA Bus core capital programs. Each project has separate start and finish dates and distinct budgets. Dates represent the outlying parameters and the budget is combined.
Contingency bus fleetEmergency ServicesExistingJuly 14, 1910N/A
Emergency generatorsProperty ProtectionsCompletedJuly 14, 1910N/A
NYCHA emergency action planProperty ProtectionsPotentialJuly 14, 1910High1111100
Protective roofingProperty ProtectionsExistingJuly 14, 1910N/A
Window protectionProperty ProtectionsExistingJuly 14, 1910N/A
CoppingProperty ProtectionsExistingJuly 14, 1910N/A
Continuity of Operations (COOP)Emergency ServicesExistingJuly 14, 1910N/A
Notify NYC Mobile ApplicationEmergency ServicesExistingJuly 14, 1910N/ANYC.gov/notifynyc
Public education through Ready New York guidesEducation and AwarenessExistingJuly 14, 1910N/Ahttps://www1.nyc.gov/site/em/ready/ready-new-york.page
Performance specifications for Urban Post-Disaster HousingPrevention and PolicyCompletedSeptember 26, 1904N/ARevisions are underway and should be complete by August 2016. Additional development of the project was conducted through the Rockefeller Foundation’s Bellagio Center.
Brownfield climate change resiliencyPrevention and PolicyCompletedFebruary 27, 1906N/A
Building Code amendmentsPrevention and PolicyExistingMarch 3, 1901N/AThe city amended the building code in 2014 with a number of provisions addressing the city’s risks from climate change. The city has established a 3 year update cycle where our construction codes undergo a significant review and amendment process to ensure their currency and responsiveness to risks to safety and health including the impacts of climate change. We are in the midst of an update, with expected enactment and implementation in 2019.
Food distribution systemPrevention and PolicyCompletedApril 4, 1904N/Ahttps://www.nycedc.com/system/files/files/resource/2016_food_supply-resiliency_study_results.pdf
Pipeline booster stationsInfrastructure ProjectCompletedJuly 14, 1910N/A
Hardening gas stationsPrevention and PolicyCompletedJuly 14, 1910N/A
Strategies to address climate change threatsPrevention and PolicyCompletedJuly 14, 1910N/A
Utility system upgrade planPrevention and PolicyCompletedNovember 4, 1902N/A
Utility system design and equipmentPrevention and PolicyExistingJuly 14, 1910N/A
New York City power supplyPrevention and PolicyExistingJuly 14, 1910N/A
Resiliency plan for the electric distribution systemPrevention and PolicyExistingJuly 14, 1910N/A
Minimizing electric outagesPrevention and PolicyCompletedJuly 14, 1910N/A
Smart grid technologyPrevention and PolicyCompletedJuly 14, 1910N/A
Utility service restoration for critical customersPrevention and PolicyCompletedJuly 14, 1910N/A
Utility service restoration for mobile substationsPrevention and PolicyCompletedJuly 14, 1910N/A
Gas transmission and distribution systemPrevention and PolicyExistingJuly 14, 1910N/A
Utility demand response programsPrevention and PolicyCompletedJuly 14, 1910N/A
Building energy efficiencyPrevention and PolicyExistingJuly 14, 1910N/A
Electric vehiclesPrevention and PolicyCompletedJuly 14, 1910N/A
Emergency notification system at JFK AirportEmergency ServicesPotentialJuly 14, 1910High1111101
NYC Substation Reconfigurations to Minimize Disruption of ServiceProperty ProtectionCompletedJuly 14, 1910N/A
Equipment integrityProperty ProtectionCompletedJuly 14, 1910N/A
Emergency response unitEducation and AwarenessExistingJuly 14, 1910N/A
SBS Continuity of Operations Plan (COOP)Emergency ServicesExistingJuly 14, 1910N/A
Emergency restoration of the Rockaway shorelineCoastal/Natural ResourcesCompletedMay 15, 1902N/Ahttp://www.nan.usace.army.mil/Media/Fact-Sheets/Fact-Sheet-Article-View/Article/487597/fact-sheet-atlantic-coast-of-new-york-city-east-rockaway-inlet-to-rockaway-inle/
Emergency restoration of Coney Island shorelineCoastal/Natural ResourcesCompletedJune 2, 1906N/Ahttp://www.nan.usace.army.mil/Missions/Civil-Works/Projects-in-New-York/Rockaway-Inlet-to-Norton-Point-Coney-Island/
Industrial property upgradesProperty ProtectionsExistingJuly 14, 1910N/A
Hardening Staten Island Ferry and private ferry terminals from climate change-related threatsProperty ProtectionExistingJuly 14, 1910N/A
Construction of new ferry landings to support private ferry servicesInfrastructure ProjectExistingJune 15, 1906N/AWork to be performed as part of City wide ferry service and to be complete by 2019
Mobile ferry ticketing machinesEmergency ServicesExistingJune 15, 1906N/AWork to be performed as part of City wide ferry service and to be complete by 2019
Use of the Staten Island Ferry's Austen Class vessels for East River Ferry service during weather-related disruptionsInfrastructure ProjectExistingJuly 12, 1903N/AWork to be performed as part of City wide ferry service and to be complete by 2019. Additionally design will support DOT's next generation Staten Island Ferry vessel
Metropolitan Hospital quick connectsEmergency ServicesExistingJune 28, 1906N/A
Bellevue Hospital/critical systems protectionPrevention and PolicyCompletedJuly 14, 1910N/A
Central Office Emergency Command Center (ECC) and alternate ECCEmergency ServicesCompletedJuly 14, 1910N/A
Coler Hospital and Nursing/AuditoriumProperty ProtectionExistingJuly 14, 1910N/A
Coler Hospital and Nursing/ Security and Critical EquipmentEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/Generator ReplacementEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/ Vertical TransportationEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/Domestic water systemEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/Medical GasEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/Pipe InsulationEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/Basemment & Fire Alarm RestorationEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/Resurfacing loading dockEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/Parking Lot LiftsEmergency ServicesExistingJuly 14, 1910N/A
Bellevue Hospital/Flood MitigationProperty ProtectionExistingJuly 14, 1910N/A
Overhead electric system improvementsPrevention and PolicyCompletedJuly 14, 1910N/A
Underground electric system improvementsPrevention and PolicyCompletedAugust 19, 1906N/A
Gas system ImprovementsPrevention and PolicyExistingJuly 14, 1910N/A
Storm-hardening of critical facilitiesPrevention and PolicyCompletedJuly 14, 1910N/A
Retail resiliency studyPrevention and PolicyCompletedApril 6, 1903N/A
Building Identification Numbers (BINs)Prevention and PolicyCompletedJuly 14, 1910N/A
BIN Working Group recommendationsPrevention and PolicyExistingJuly 14, 1910N/A
Staff trainingPrevention and PolicyExistingJuly 14, 1910N/AImplemented/Ongoing
Staff trainingPrevention and PolicyExistingJuly 14, 1910N/AImplemented/Ongoing
Department Emergency Operations CenterEmergency ServicesCompletedApril 4, 1904N/A
COOP Plan developmentPrevention and PolicyExistingJuly 14, 1910N/A
DOE Mass Casualty and Anti-Terrorism MitigationPrevention and PolicyPotentialJuly 14, 1910High1111100
Fleet Relocation PlanPrevention and PolicyCompletedApril 4, 1904N/A
Facility AccessibilityPrevention and PolicyExistingOctober 4, 1906N/A
Provision of power redundancyEmergency ServicesPotentialJuly 14, 1910High1011110
Backup power for evacuation sheltersEmergency ServicesExistingJune 22, 1901N/AThe City has identified 18 total Hurricane Shelters, including 16 Evacuation Centers as candidates to receive quick connects.
Emergency preparedness plans and training for DOE StaffPrevention and PolicyCompletedJuly 14, 1910N/A
Residential Building AssessmentEmergency ServicesExistingJuly 14, 1910N/A
Environmental Health Assessment - Shelters (EHAS)Emergency ServicesExistingJuly 14, 1910N/AOperational plan developed
DOHMH warehouse and print shop capacityInfrastructure ProjectExistingJuly 14, 1910N/A
DOHMH facility repair and upgradeProperty ProtectionsExistingJuly 14, 1910N/Avarious ongoing
COOP trailer compoundEmergency ServicesExistingJuly 14, 1910N/AA portion of the COOP trailers have been acquired.
Backup communications carrierEmergency ServicesExistingJune 15, 1906N/A
Next-generation satellite phonesEmergency ServicesPotentialJuly 14, 1910High1111100Working on getting most of current satellite phone equipment upgraded to a G2 system.
FDNY facilities surveyInfrastructure ProjectExistingJuly 14, 1910N/APartially completed. Haggerty surveyed the facilities damaged by Sandy.
Spare radiosEmergency ServicesExistingMarch 3, 1901N/AFDNY Radio shops is in the process of purchasing the Motorola APX 8000 model, they will all be trunked capable.
Home-work plansPrevention and PolicyExistingMarch 3, 1901N/APersonnel now have laptops and wifi cards.
Harlem-125 Street Station improvementsInfrastructure ProjectExistingJuly 14, 1910N/A
Marine Parkway/Cross Bay Bridge mitigation master planPrevention and PolicyExistingJuly 14, 1910N/A
Engineering flood studies at non-tunnel facilitiesPrevention and PolicyCompletedDecember 15, 1906N/AMultiple B&T structures improvement projects are proposed in the 2015-19 Capital Program.
Staten Island Ferry fleet upgradeInfrastructure ProjectExistingDecember 23, 1906N/A
Community Engagement in EmergenciesEducation and AwarenessExistingJuly 14, 1910N/Ahttps://www1.nyc.gov/site/em/ready/community-preparedness.pageThis is an ongoing process. The educational material and community survey are currently available. The identification of new networks and growth of our local connections is ongoing.
NYC Post-Disaster Housing and Community Recovery PlanPrevention and PolicyCompletedJuly 14, 1910N/A
Hazard Mitigation Assistance (HMA) Investment ToolProperty ProtectionsPotentialJuly 14, 1910High1111110NYCEM applied for HMGP and PDM funds and is still waiting to hear if the project was approved.
Hazard History and Consequence ToolEducation and AwarenessExistingJuly 14, 1910N/ADeveloping a public facing version of the tool. Added all hazards events in the 2014 HMP.
CERT collaboration with community groupsEducation and AwarenessExistingJuly 14, 1910N/Ahttps://www1.nyc.gov/site/em/volunteer/be-involved.page
Ready New York updateEducation and AwarenessCompletedJuly 14, 1910N/A
Public/private mitigation initiativesEducation and AwarenessExistingJuly 14, 1910N/A
Mitigation public outreachEducation and AwarenessExistingJuly 14, 1910N/AHazard Mitigation and External Affairs unit worked on a RNY Reduce Your Risk presentation and have given several over the past year (2015)
New York City mitigation guideEducation and AwarenessCompletedJuly 14, 1910N/A
Building community capacityEducation and AwarenessCompletedJuly 14, 1910N/A
Close to Home: An Urban Model for Post-Disaster HousingPrevention and PolicyCompletedFebruary 22, 1907N/Ahttps://www1.nyc.gov/assets/whatifnyc/downloads/pdf/close_to_home.pdfcombined with other actions
Request for proposal for urban post-disaster housingPrevention and PolicyExistingJuly 14, 1910N/ACombined with other actions
Develop Viable Backup Continuity of Operations (COOP) SitesPrevention and PolicyPotentialJuly 14, 1910High1111100
Resilient EdgemereProperty ProtectionsExistingMarch 12, 1903
Window upgradesProperty ProtectionsExistingJuly 14, 1910Medium
Inspection and upgrade program for DEP facilitiesProperty ProtectionExistingJuly 14, 1910Medium
Groundwater developmentInfrastructure ProjectPotentialJuly 14, 1910Medium1111000
Groundwater treatment plantInfrastructure ProjectPotentialJuly 14, 1910Medium1011010
Laptops for DFTA essential staffEmergency ServicesExistingApril 3, 1900High
Hardening of Critical City-Owned FacilitiesProperty ProtectionsPotentialJuly 14, 1910Medium1-111-110
Power redundancy at DHS buildingsEmergency ServicesPotentialJuly 14, 1910High11111-10
DHS shelter protectionPrevention and PolicyPotentialJuly 14, 1910Medium0001100
Mobile command stationsEmergency ServicesExistingJuly 14, 1910Medium
DOB backup generatorsEmergency ServicesExistingJuly 14, 1910LowBack-up generator with limited power for building operations at 280 Broadway.
DOB radiosEmergency ServicesPotentialJuly 14, 1910Medium0111000
DOB vehiclesEmergency ServicesExistingJuly 14, 1910MediumDOB has 19 vehicles with emergency light packages
Stormwater managementInfrastructure ProjectPotentialJuly 14, 1910High1111100
Rikers Island ferry dockInfrastructure ProjectPotentialJuly 14, 1910Medium1111100
Roof and faade improvementsProperty ProtectionsExistingMay 4, 1907MediumPW 3118
Emergency Operations Center improvementsProperty ProtectionsCompletedMay 10, 1907Medium
Manhattan Detention Complex (MDC) cellar/backup emergency systemEmergency ServicesPotentialJuly 14, 1910Medium1111100
Protection of DOE facilities from electrical system damage from treesProperty ProtectionsPotentialJuly 14, 1910High1111100
Surge protection for DOE critical electrical systemsEmergency ServicesPotentialJuly 14, 1910High1111100
Psychological First Aid (PFA)Education and AwarenessPotentialJuly 14, 1910High1111101
Mental Health First Aid public education programEducation and AwarenessExistingJuly 14, 1910Medium
Mental health system power backupEmergency ServicesPotentialJuly 14, 1910High1111100
Mental health system support networkEducation and AwarenessPotentialJuly 14, 1910High1111101
Mental health volunteer preparedness and responseEducation and AwarenessPotentialJuly 14, 1910High1111101
DOHMH IT systems protectionInfrastructure ProjectPotentialJuly 14, 1910High1111101
DOHMH primary data center availabilityProperty ProtectionsPotentialJuly 14, 1910High1111101
Health data and provider portalEmergency ServicesExistingMarch 3, 1901High
Enhanced emergency response communication operations at DOHMH headquartersEmergency ServicesCompletedJuly 14, 1910HighAll work complete and tested
Small grants program to support community-based social cohesionPrevention and PolicyPotentialJuly 14, 1910Medium11-11101
Hub the Hood programPrevention and PolicyPotentialJuly 14, 1910High1111011
Notification system for City employees (Everbridge)Emergency ServicesCompletedJuly 14, 1910Medium
Data Center Site BInfrastructure ProjectCompletedJuly 14, 1910Medium
Redundant power for all mission-critical DOT sitesEmergency ServicesPotentialJuly 14, 1910High1111100Cost estimate- TBD. NYCDOT has not secured funding from OMB for this project at this time.
Staten Island Ferry vessel improvementInfrastructure ProjectExistingJuly 26, 1907MediumDOT plans to retrofit the Molinari Class with high lift rudders. These will offer more maneuverability for this class, which will assist in periods of high winds. Design is underway and installation will occur during vessel drydock periods.
Waterfront fueling facilitiesPrevention and PolicyPotentialJuly 14, 1910High1111101
Gas vendorsEmergency ServicesPotentialJuly 14, 1910High1111100
Outreach to residential building ownersEducation and AwarenessPotentialJuly 14, 1910High1111100
Public education and outreach for landmarked buildingsEducation and AwarenessCompletedJuly 14, 1910High
Hazards/threats planningPrevention and PolicyExistingJuly 14, 1910High
Fueling capabilities/backup for emergency responsePrevention and PolicyPotentialJuly 14, 1910High1111100
Penn Station accessInfrastructure ProjectExistingJuly 14, 1910HighThis project is currently in early design.
Emergency management equipmentProperty ProtectionsExistingAugust 27, 1907HighThe following emergency management equipment has been delivered and/or installed: 4 tow behind generators, 8 portable radio kits, 25 portable generators, mobile generator for Nassau Tower, permanent generators for Farmingdale and Divide Tower. Purchase Orders have been issued for permanent generators for Upper Holban Yard, Babylon Tower and Queens Tower. Mobile substation for Brentwood is in final design. Ronkonkoma fuel station should be constructed in late 2017.
NYCHA grounds, pavements, and drainage improvementsProperty ProtectionsExistingJuly 14, 1910HighNYCHA has a long-term agreement with DEP to construct green infrastructure at NYCHA developments. One site is under construction and 19 are in design/assessment.
Full-backup power for NYCHA developmentsProperty ProtectionsCompletedApril 6, 1903Medium
Morrisania Air RightsProperty ProtectionsPotentialJuly 14, 1910High1111100
NYCHA AC system improvementsPrevention and PolicyExistingJuly 14, 1910MediumNYCHA is piloting "smart" A/C system at Meltzer Tower, a senior building in Manhattan
NYPD precinct facility protection - 120th PctProperty ProtectionsCompletedSeptember 19, 1907Medium
NYPD facility protectionProperty ProtectionPotentialJuly 14, 1910Medium1111000
NYPD critical facilities protectionProperty ProtectionPotentialJuly 14, 1910Medium1111000
OCME Unified Agency Operations CenterEmergency ServicesExistingJuly 14, 1910High
NYCEM facilities protectionProperty ProtectionPotentialJuly 14, 1910Medium1011010
NYCEM warehouse and Emergency Operations Center (EOC) backup siteEmergency ServicesExistingOctober 8, 1907MediumFinalizing construction plans
Urban post-disaster housing site identification in New York CityPrevention and PolicyExistingOctober 14, 1907HighThis information will be published in the forthcoming “A Guide to Using Deployable Housing for Urban Post-Disaster Housing Recovery”.
Fuel advance warning systemEmergency ServicesPotentialJuly 14, 1910High1111101
JFK Airport electrical system resiliencyEmergency ServicesPotentialJuly 14, 1910Medium1111100
LaGuardia Airport central electric substationEmergency ServicesExistingJuly 14, 1910High
LaGuardia Airport electrical system enhancementEmergency ServicesPotentialJuly 14, 1910High1111101
LaGuardia Airport power system redundancyEmergency ServicesPotentialJuly 14, 1910High1111101
JFK Airport power system redundancyEmergency ServicesPotentialJuly 14, 1910High1111101
Stewart Airport standby emergency generatorEmergency ServicesPotentialJuly 14, 1910High1111101
Stewart Airport power system redundancyEmergency ServicesPotentialJuly 14, 1910High1111100
JFK Airport fuel storageInfrastructure ProjectPotentialJuly 14, 1910High1111101
Intelligent Transportation System (ITS) at JFK and Newark AirportsEmergency ServicesPotentialJuly 14, 1910High1111101
Emergency generator capacity for Red Hook and Howland Hook container terminalsEmergency ServicesPotentialJuly 14, 1910High1111101
Lincoln Tunnel electrical and power system improvementsEmergency ServicesPotentialJuly 14, 1910High1111101
George Washington Bridge (GWB) electrical and power system improvementsEmergency ServicesPotentialJuly 14, 1910High1111101
GWB tower transformersEmergency ServicesPotentialJuly 14, 1910High1111101
Multi-facility real-time traffic information softwareEmergency ServicesPotentialJuly 14, 1910Medium111-1101
Intelligent Transportation System (ITS) programEmergency ServicesPotentialJuly 14, 1910Medium1-111101
Overhead electric infrastructureProperty ProtectionExistingJuly 14, 1910Low
Storm damage mitigationInfrastructure ProjectExistingJuly 14, 1910Low
SBS Digital OutreachEducation and AwarenessExistingJuly 14, 1902Medium
Toolkit and training materials for volunteer groupsEmergency ServicesPotentialJuly 14, 1910High1011101
Small business outreachEducation and AwarenessExistingMarch 3, 1901Medium
Hazard mitigation education for businessesEducation and AwarenessExistingMarch 3, 1901Medium
Risk assessments and GrantsEducation and AwarenessExistingMarch 3, 1901Medium
Toolkit and training materials for Business Improvement Districts (BID) and Local Development Corporations (LDC) on mitigation best practicesEducation and AwarenessPotentialJuly 14, 1910High1011001
Hazard mitigation seminar for BIDs and LDCsEducation and AwarenessPotentialJuly 14, 1910Medium1011000
Emergency Loan and Grant ProgramEducation and AwarenessPotentialJuly 14, 1910High1111101
Rockaway Reformulation StudyCoastal/Natural ResourcesPotentialOctober 8, 1907Medium1111010http://www.nan.usace.army.mil/Media/Fact-Sheets/Fact-Sheet-Article-View/Article/487597/fact-sheet-atlantic-coast-of-new-york-city-east-rockaway-inlet-to-rockaway-inle/
Reformulation Study underway; final report/EIS approval scheduled for 2019
T-groins at Coney IslandCoastal/Natural ResourcesCompletedFebruary 8, 1908Highhttp://www.nan.usace.army.mil/Missions/Civil-Works/Projects-in-New-York/Rockaway-Inlet-to-Norton-Point-Coney-Island/
Network and internet services improvementsProperty ProtectionsPotentialJuly 14, 1910Medium1111100
Emergency alert applicationEmergency ServicesPotentialJuly 14, 1910High1111100
Crisis Management Tool DevelopmentEmergency ServicesCompletedFebruary 26, 1901N/A
Mass Notification SystemEmergency ServicesPotentialJuly 14, 1910High1111100
Training and ExercisesPrevention and PolicyPotentialMay 15, 1902Medium1111100
Manhattan Borough Shop - 26th Street - Repair and Flood Hazard MitigationPrevention and PolicyExistingJuly 14, 1910N/A
44 Beaver Street - Repair and Flood Hazard MitigationPrevention and PolicyExistingJuly 14, 1910N/A
Bronx 12 - Repair and Flood Hazard MitigationPrevention and PolicyExistingJuly 14, 1910N/A
Greenpoint Warehouse - Repair and Flood Hazard MitigationPrevention and PolicyExistingJuly 14, 1910N/ATBD- In design; immediate work was completed. Design underway to construct an exterior electrical platform to elevate the transformer and switchgear.  Construct an interior mezzanine to elevate the boiler, fire suppression equipment, and some electrical equipment. 
Pier 36 - Repair and Flood Hazard MitigationPrevention and PolicyExistingJuly 14, 1910N/ATBD- In design; Immediate work was completed. Ongoing mitigation study; protection is being considered for the office, underground tanks, fire pump room, and garage areas
DSNY Consolidated Facilities (428 TBD)Prevention and PolicyPotentialJuly 14, 1910Low0000000Not prioritized since scope not available.
Bridge reinforcementInfrastructure ProjectExistingJuly 14, 1910N/A
Protection of NYCDOT facilities from high windsProperty ProtectionsExistingJuly 14, 1910N/ANYCDOT continues to upgrade the bracing of trailers as trailers are replaced. The agency is also upgrading roofs of buildings at the Dubois Yard, Hamilton Plant, 25 14th Street, 32-11 Harper Street.
Rooftop equipment protection for Critical City-Owned FacilitiesProperty ProtectionsPotentialJuly 14, 1910High1011110
Increased line clearance tree trim programProperty ProtectionExistingJuly 14, 1910Medium
Construction Code revisionPrevention and PolicyCompletedJuly 14, 1910N/A
Infrastructure and equipment protection for subway trainsProperty ProtectionExistingJuly 14, 1910N/A
Improved snow and ice meltInfrastructure ProjectExistingJuly 14, 1910N/ADepartment of Sanitation is exploring pre-treatment options that would result in decreased wear and tear on pavement surface after snow events. DSNY is testing the use of a beet juice / brine liquid product to pre-treat roadways and test its effectiveness in thwarting accumulations.
Outreach to property owners on impacts of snow loadsEducation and AwarenessPotentialJuly 14, 1910High1111111
January 1, 1970